IAC logo
IAC Assessment: IA0456
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0456
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2010
Principal Product Pure Gypsum and Limestone
NAICS 327410 - Lime Manufacturing
SIC 3274 - Lime
Sales $10,000,000-$50,000,000
# of Employees 36
Plant Area (Sq.Ft.) 35,000
Annual Production 100,000 Tons
Production Hrs. Annual 6,240
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $264,279 6,070,003 kWh $0.04
Electricity Demand $170,222 12,900 kW-months/year $13.20
Natural Gas $791,141 146,968 MMBtu $5.38
TOTAL ENERGY COSTS $1,225,642
RECOMMENDED SAVINGS* $32,874 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,090
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,544
Cost:
$16,376
$7,632 174,626 $4,912 372 $7,632
174,626
kWh
$4,912
372
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,332
Cost:
$3,835
$1,420 32,485 $912 69 $1,420
32,485
kWh
$912
69
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,800
Cost:
$1,799
$1,049 23,972 $1,751 133 $1,049
23,972
kWh
$1,751
133
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$385
Cost:
$717
$385 8,799 - - $385
8,799
kWh
-
-
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$657
Cost:
$50
$437 10,008 $220 17 $437
10,008
kWh
$220
17
kW-months/year
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$565
Cost:
$50
$358 8,175 $207 16 $358
8,175
kWh
$207
16
kW-months/year
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,067
Cost:
$2,774
$710 16,236 $357 28 $710
16,236
kWh
$357
28
kW-months/year
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$12,524
Cost:
-
$8,338 190,800 $4,186 318 $8,338
190,800
kWh
$4,186
318
kW-months/year
TOTAL RECOMMENDED Savings:
$32,874
Cost:
$25,601
$20,329 465,101 $12,545 953 $20,329
465,101
kWh
$12,545
953
kW-months/year
TOTAL IMPLEMENTED Savings:
$29,090
Cost:
$18,275
$17,814 407,581 $11,276 856 $17,814
407,581
kWh
$11,276
856
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand