Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2010 |
Principal Product | Dairy, Nonfat dry milk |
NAICS | 311511 - Fluid Milk Manufacturing |
SIC | 2023 - Dry, Condensed, Evaporated Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 47 |
Plant Area (Sq.Ft.) | 78,000 |
Annual Production | 500,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $457,883 | 6,903,000 | kWh | $0.07 |
Electricity Demand | $83,938 | 11,587 | kW-months/year | $7.24 |
Natural Gas | $1,012,258 | 190,031 | MMBtu | $5.33 |
TOTAL ENERGY COSTS | $1,554,079 | |||
RECOMMENDED SAVINGS* | $72,227 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,076 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,460 Cost: $3,923 |
$3,513 | 52,951 | $947 | 130 | - | - |
$3,513 52,951 kWh |
$947 130 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,643 Cost: $1,978 |
$1,643 | 24,760 | - | - | - | - |
$1,643 24,760 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS |
Savings: $21,406 Cost: $10,000 |
$21,406 | 322,392 | - | - | - | - |
$21,406 322,392 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $23,761 Cost: $1,000 |
- | - | - | - | $23,761 | 4,458 |
- - kWh |
- - kW-months/year |
$23,761 4,458 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $7,611 Cost: $1,500 |
- | - | - | - | $7,611 | 1,428 |
- - kWh |
- - kW-months/year |
$7,611 1,428 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $2,057 Cost: $1,500 |
- | - | - | - | $2,057 | 386 |
- - kWh |
- - kW-months/year |
$2,057 386 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $700 Cost: $1,000 |
- | - | - | - | $700 | 130 |
- - kWh |
- - kW-months/year |
$700 130 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,899 Cost: $329 |
$3,349 | 50,436 | $550 | 76 | - | - |
$3,349 50,436 kWh |
$550 76 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,256 Cost: $500 |
$4,572 | 68,853 | $684 | 95 | - | - |
$4,572 68,853 kWh |
$684 95 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,434 Cost: $450 |
$1,248 | 18,746 | $186 | 26 | - | - |
$1,248 18,746 kWh |
$186 26 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $72,227 Cost: $22,180 |
$35,731 | 538,138 | $2,367 | 327 | $34,129 | 6,402 | $35,731 538,138 kWh |
$2,367 327 kW-months/year |
$34,129 6,402 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,076 Cost: $6,752 |
$11,434 | 172,240 | $2,181 | 301 | $24,461 | 4,588 | $11,434 172,240 kWh |
$2,181 301 kW-months/year |
$24,461 4,588 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |