IAC Assessment: IA0460
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0460
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2011
Principal Product Pellet Die and Hammer Mills
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales <$500,000
# of Employees 81
Plant Area (Sq.Ft.) 120,000
Annual Production 1 Units
Production Hrs. Annual 6,240
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $181,575 3,624,252 kWh $0.05
Electricity Demand $3,236 628 kW-months/year $5.15
Natural Gas $24,037 2,916 MMBtu $8.24
TOTAL ENERGY COSTS $208,848
RECOMMENDED SAVINGS* $12,081 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,581
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,522
Cost:
$4,244
$2,047 40,768 $475 80 - - $2,047
40,768
kWh
$475
80
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,099
Cost:
$7,498
$4,260 84,864 $839 163 - - $4,260
84,864
kWh
$839
163
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$802
Cost:
$1,695
$575 11,457 $227 44 - - $575
11,457
kWh
$227
44
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$282
Cost:
$200
$282 5,624 - - - - $282
5,624
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$195
Cost:
$200
$147 2,926 $48 10 - - $147
2,926
kWh
$48
10
kW-months/year
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$333
Cost:
$200
$285 5,684 $48 10 - - $285
5,684
kWh
$48
10
kW-months/year
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$367
Cost:
$50
$281 5,600 $86 17 - - $281
5,600
kWh
$86
17
kW-months/year
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$575
Cost:
$50
$495 9,780 $80 16 - - $495
9,780
kWh
$80
16
kW-months/year
-
-
MMBtu
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,176
Cost:
$3,670
$1,019 20,305 $157 30 - - $1,019
20,305
kWh
$157
30
kW-months/year
-
-
MMBtu
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$730
Cost:
$200
- - - - $730 89 -
-
kWh
-
-
kW-months/year
$730
89
MMBtu
TOTAL RECOMMENDED Savings:
$12,081
Cost:
$18,007
$9,391 187,008 $1,960 369 $730 89 $9,391
187,008
kWh
$1,960
369
kW-months/year
$730
89
MMBtu
TOTAL IMPLEMENTED Savings:
$10,581
Cost:
$17,557
$8,749 174,302 $1,832 344 - - $8,749
174,302
kWh
$1,832
344
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas