IAC logo
IAC Assessment: IA0465
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0465
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2011
Principal Product Vertical Turbine Pumps
NAICS 333911 - Pump and Pumping Equipment Manufacturing
SIC 3561 - Pumps And Pumping Equipment
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 220,000
Annual Production 8,001 Pieces
Production Hrs. Annual 6,552
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $501,288 7,006,800 kWh $0.07
Natural Gas $89,211 13,555 MMBtu $6.58
TOTAL ENERGY COSTS $590,499
RECOMMENDED SAVINGS* $58,849 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,456
Cost:
$246
$2,456 37,161 - - $2,456
37,161
kWh
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,745
Cost:
$396
$1,745 24,390 - - $1,745
24,390
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,614
Cost:
$7,406
$3,614 50,540 - - $3,614
50,540
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,910
Cost:
$60,314
$27,910 390,624 - - $27,910
390,624
kWh
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,368
Cost:
$616
$1,368 19,140 - - $1,368
19,140
kWh
-
-
MMBtu
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$302
Cost:
$13
- - $302 46 -
-
kWh
$302
46
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,240
Cost:
$8,646
$1,240 17,306 - - $1,240
17,306
kWh
-
-
MMBtu
08: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$20,214
Cost:
$48,000
- - $20,214 3,072 -
-
kWh
$20,214
3,072
MMBtu
TOTAL RECOMMENDED Savings:
$58,849
Cost:
$125,637
$38,333 539,161 $20,516 3,118 $38,333
539,161
kWh
$20,516
3,118
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas