Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2012 |
Principal Product | Expandable Foam |
NAICS | 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
SIC | 3081 - Unsupported Plastics Film & Sheet |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 82,500 |
Annual Production | 4,800,000 Pounds |
Production Hrs. Annual | 6,120 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $101,967 | 2,876,000 | kWh | $0.04 |
Electricity Demand | $92,576 | 6,268 | kW-months/year | $14.77 |
Electricity Fees | $6,775 | - | $ | - |
Natural Gas | $308,466 | 58,142 | MMBtu | $5.31 |
TOTAL ENERGY COSTS | $509,784 | |||
RECOMMENDED SAVINGS* | $25,476 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $2,225 Cost: $401 |
- | - | - | - | $2,225 | 419 |
- - kWh |
- - kW-months/year |
$2,225 419 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $664 Cost: $390 |
$225 | 6,365 | $439 | 30 | - | - |
$225 6,365 kWh |
$439 30 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $442 Cost: $1,424 |
$442 | 12,460 | - | - | - | - |
$442 12,460 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $769 Cost: $799 |
$424 | 11,996 | $345 | 24 | - | - |
$424 11,996 kWh |
$345 24 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,589 Cost: $11,275 |
$6,401 | 181,348 | $4,188 | 286 | - | - |
$6,401 181,348 kWh |
$4,188 286 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,822 Cost: $971 |
$1,686 | 47,790 | $1,136 | 95 | - | - |
$1,686 47,790 kWh |
$1,136 95 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $1,014 Cost: $1,466 |
- | - | - | - | $1,014 | 191 |
- - kWh |
- - kW-months/year |
$1,014 191 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,427 Cost: $250 |
$786 | 22,278 | $641 | 43 | - | - |
$786 22,278 kWh |
$641 43 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,537 Cost: $7,700 |
$1,726 | 48,882 | $2,811 | 192 | - | - |
$1,726 48,882 kWh |
$2,811 192 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $987 Cost: $1,009 |
$516 | 14,647 | $471 | 32 | - | - |
$516 14,647 kWh |
$471 32 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $25,476 Cost: $25,685 |
$12,206 | 345,766 | $10,031 | 701 | $3,239 | 610 | $12,206 345,766 kWh |
$10,031 701 kW-months/year |
$3,239 610 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |