Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2013 |
Principal Product | Hydraulic pumps and motors |
NAICS | 333611 - Turbine and Turbine Generator Set Units Manufacturing |
SIC | 3511 - Turbines And Turbine Generator Sets |
Sales | $100,000,000-$500,000,000 |
# of Employees | 491 |
Plant Area (Sq.Ft.) | 359,060 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,695,113 | 24,854,540 | kWh | $0.07 |
Electricity Demand | $148,946 | 50,677 | kW-months/year | $2.94 |
Natural Gas | $130,769 | 30,334 | MMBtu | $4.31 |
TOTAL ENERGY COSTS | $1,974,828 | |||
RECOMMENDED SAVINGS* | $139,054 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $128,741 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $112,998 Cost: $128,338 |
$106,545 | 1,564,536 | $6,453 | 2,143 | - | - |
$106,545 1,564,536 kWh |
$6,453 2,143 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,326 Cost: $2,120 |
$2,326 | 34,157 | - | - | - | - |
$2,326 34,157 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $11,452 Cost: $2,000 |
$10,798 | 158,556 | $654 | 217 | - | - |
$10,798 158,556 kWh |
$654 217 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,291 Cost: $105 |
$4,045 | 59,405 | $246 | 82 | - | - |
$4,045 59,405 kWh |
$246 82 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $7,659 Cost: $3,000 |
$7,269 | 106,733 | $390 | 146 | - | - |
$7,269 106,733 kWh |
$390 146 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $328 Cost: $200 |
- | - | - | - | $328 | 76 |
- - kWh |
- - kW-months/year |
$328 76 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $139,054 Cost: $135,763 |
$130,983 | 1,923,387 | $7,743 | 2,588 | $328 | 76 | $130,983 1,923,387 kWh |
$7,743 2,588 kW-months/year |
$328 76 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $128,741 Cost: $130,443 |
$121,388 | 1,782,497 | $7,353 | 2,442 | - | - | $121,388 1,782,497 kWh |
$7,353 2,442 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |