Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2013
Principal Product Wooden Cabinets for the Medical Industry
NAICS 337127 - Institutional Furniture Manufacturing
SIC 2521 - Wood Office Furniture
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 400,000
Annual Production 48,000 Units
Production Hrs. Annual 2,080
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $196,428 2,808,000 kWh $0.07
Electricity Demand $111,590 13,944 kW-months/year $8.00
Electricity Fees $26,684 - $ -
Natural Gas $51,002 9,993 MMBtu $5.10
TOTAL ENERGY COSTS $385,704
RECOMMENDED SAVINGS* $21,184 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,212
Cost:
$105
$1,194 17,056 $1,018 127 - - $1,194
17,056
kWh
$1,018
127
kW-months/year
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$12,322
Cost:
$105
$7,426 106,080 $4,897 613 - - $7,426
106,080
kWh
$4,897
613
kW-months/year
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,346
Cost:
$3,600
- - - - $1,346 264 -
-
kWh
-
-
kW-months/year
$1,346
264
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$783
Cost:
$3,064
$783 11,185 - - - - $783
11,185
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$629
Cost:
$1,795
$380 5,140 $249 31 - - $380
5,140
kWh
$249
31
kW-months/year
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,635
Cost:
$13,667
$1,027 14,667 $608 76 - - $1,027
14,667
kWh
$608
76
kW-months/year
-
-
MMBtu
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,257
Cost:
$27
- - - - $2,257 408 -
-
kWh
-
-
kW-months/year
$2,257
408
MMBtu
TOTAL RECOMMENDED Savings:
$21,184
Cost:
$22,363
$10,810 154,128 $6,772 847 $3,603 672 $10,810
154,128
kWh
$6,772
847
kW-months/year
$3,603
672
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas