IAC logo
IAC Assessment: IA0534
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0534
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2015
Principal Product Renewable Corn Products
NAICS 311221 - Wet Corn Milling
SIC 2046 - Wet Corn Milling
Sales $1,000,000-$5,000,000
# of Employees 43
Plant Area (Sq.Ft.) 100,000
Annual Production 45,000 Tons
Production Hrs. Annual 8,760
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $539,067 8,511,320 kWh $0.06
Electricity Demand $178,636 16,853 kW-months/year $10.60
Electricity Fees $14,645 - $ -
Natural Gas $9,663 1,448 MMBtu $6.67
TOTAL ENERGY COSTS $742,011
RECOMMENDED SAVINGS* $20,731 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,514
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,201
Cost:
$9,836
$9,080 143,490 $2,121 200 - - $9,080
143,490
kWh
$2,121
200
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,029
Cost:
$542
$3,906 61,691 $1,123 106 - - $3,906
61,691
kWh
$1,123
106
kW-months/year
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,913
Cost:
$11,538
$2,369 37,431 $544 52 - - $2,369
37,431
kWh
$544
52
kW-months/year
-
-
MMBtu
04: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$590
Cost:
$2,620
$590 9,312 - - - - $590
9,312
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$356
Cost:
$269
$289 4,552 $67 6 - - $289
4,552
kWh
$67
6
kW-months/year
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$338
Cost:
$1,008
- - - - $338 51 -
-
kWh
-
-
kW-months/year
$338
51
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$304
Cost:
$488
$304 4,777 - - - - $304
4,777
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$20,731
Cost:
$26,301
$16,538 261,253 $3,855 363 $338 51 $16,538
261,253
kWh
$3,855
363
kW-months/year
$338
51
MMBtu
TOTAL IMPLEMENTED Savings:
$17,514
Cost:
$14,275
$13,865 219,045 $3,311 312 $338 51 $13,865
219,045
kWh
$3,311
312
kW-months/year
$338
51
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas