IAC logo
IAC Assessment: IC0003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2001
Principal Product Point of Purchase Displays
NAICS n/a
SIC 3993 - Signs And Advertising Specialities
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 130,000
Annual Production 45,000 Pieces
Production Hrs. Annual 4,290
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,113 828,083 kWh $0.04
Electricity Demand $36,433 2,964 kW-months/year $12.29
Electricity Fees $7,732 - $ -
Natural Gas $76,816 12,805 MMBtu $6.00
TOTAL ENERGY COSTS $162,854
RECOMMENDED SAVINGS* $77,367 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,749
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,749
Cost:
$1,150
$2,429 67,472 $2,320 189 - - - - - - - - $2,429
67,472
kWh
$2,320
189
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,491
Cost:
$10,553
$3,012 83,660 $479 39 - - - - - - - - $3,012
83,660
kWh
$479
39
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$737
Cost:
-
- - $737 5 - - - - - - - - -
-
kWh
$737
5
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,197
Cost:
-
- - $2,197 15 - - - - - - - - -
-
kWh
$2,197
15
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$593
Cost:
$1,804
$159 4,415 - 73 - - $361 - - - $73 - $159
4,415
kWh
-
73
kW-months/year
-
-
lb
$361
-
$
-
-
$
$73
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$5,600
Cost:
-
- - - - $5,600 - - - - - - - -
-
kWh
-
-
kW-months/year
$5,600
-
lb
-
-
$
-
-
$
-
-
$
07: 4.4260 MODIFY WORKLOAD Savings:
$60,000
Cost:
$4,000
- - - - - - $44,000 - $16,000 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$44,000
-
$
$16,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$77,367
Cost:
$17,507
$5,600 155,547 $5,733 321 $5,600 - $44,361 - $16,000 - $73 - $5,600
155,547
kWh
$5,733
321
kW-months/year
$5,600
-
lb
$44,361
-
$
$16,000
-
$
$73
-
$
TOTAL IMPLEMENTED Savings:
$4,749
Cost:
$1,150
$2,429 67,472 $2,320 189 - - - - - - - - $2,429
67,472
kWh
$2,320
189
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost