IAC Assessment: IC0005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2001
Principal Product Testing Equipment
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 130,000
Annual Production 1,000 Pieces
Production Hrs. Annual 5,100
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,526 2,321,521 kWh $0.04
Electricity Demand $83,304 6,756 kW-months/year $12.33
Electricity Fees $32,039 - $ -
Natural Gas $31,380 4,845 MMBtu $6.48
TOTAL ENERGY COSTS $256,949
RECOMMENDED SAVINGS* $505,200 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,229
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,125
Cost:
$2,600
$5,416 127,732 $3,709 301 - - - - - - $5,416
127,732
kWh
$3,709
301
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$390
Cost:
$491
$222 5,232 $168 14 - - - - - - $222
5,232
kWh
$168
14
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,971
Cost:
$88,900
$14,237 335,779 $15,734 1,275 - - - - - - $14,237
335,779
kWh
$15,734
1,275
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$22,773
Cost:
$4,940
$9,549 225,206 $13,224 1,072 - - - - - - $9,549
225,206
kWh
$13,224
1,072
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$941
Cost:
$2,995
$365 8,620 $146 12 $323 - - - $107 - $365
8,620
kWh
$146
12
kW-months/year
$323
-
$
-
-
$
$107
-
$
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$102,000
Cost:
$15,000
- - - - $75,000 - $27,000 - - - -
-
kWh
-
-
kW-months/year
$75,000
-
$
$27,000
-
$
-
-
$
07: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$340,000
Cost:
$8,500
- - - - - - $340,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$340,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$505,200
Cost:
$123,426
$29,789 702,569 $32,981 2,674 $75,323 - $367,000 - $107 - $29,789
702,569
kWh
$32,981
2,674
kW-months/year
$75,323
-
$
$367,000
-
$
$107
-
$
TOTAL IMPLEMENTED Savings:
$33,229
Cost:
$11,026
$15,552 366,790 $17,247 1,399 $323 - - - $107 - $15,552
366,790
kWh
$17,247
1,399
kW-months/year
$323
-
$
-
-
$
$107
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost