IAC logo
IAC Assessment: IC0008
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0008
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2001
Principal Product Custom Compound Resins
NAICS n/a
SIC 3087 - Custom Compound Purchased Resins
Sales $10,000,000-$50,000,000
# of Employees 99
Plant Area (Sq.Ft.) 46,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 6,120
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,385 2,162,820 kWh $0.03
Electricity Demand $65,378 5,342 kW-months/year $12.24
Electricity Fees $9,581 - $ -
Natural Gas $74,217 10,018 MMBtu $7.41
TOTAL ENERGY COSTS $272,261
RECOMMENDED SAVINGS* $89,329 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,027
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,871
Cost:
$1,200
$1,084 32,825 $787 64 - - - - - - $1,084
32,825
kWh
$787
64
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$418
Cost:
-
$242 7,343 $176 14 - - - - - - $242
7,343
kWh
$176
14
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,738
Cost:
$12,553
$316 9,561 $5,422 443 - - - - - - $316
9,561
kWh
$5,422
443
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,513
Cost:
$4,800
$495 15,009 $2,018 165 - - - - - - $495
15,009
kWh
$2,018
165
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$374
Cost:
$1,462
$78 2,366 $40 3 $193 - - - $63 - $78
2,366
kWh
$40
3
kW-months/year
$193
-
$
-
-
$
$63
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,715
Cost:
$82,109
$5,173 156,756 $4,542 371 - - - - - - $5,173
156,756
kWh
$4,542
371
kW-months/year
-
-
$
-
-
$
-
-
$
07: 4.426 MODIFY WORKLOAD Savings:
$68,700
Cost:
$7,200
- - - - $50,700 - $18,000 - - - -
-
kWh
-
-
kW-months/year
$50,700
-
$
$18,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$89,329
Cost:
$109,324
$7,388 223,860 $12,985 1,060 $50,893 - $18,000 - $63 - $7,388
223,860
kWh
$12,985
1,060
kW-months/year
$50,893
-
$
$18,000
-
$
$63
-
$
TOTAL IMPLEMENTED Savings:
$8,027
Cost:
$13,753
$1,642 49,729 $6,385 521 - - - - - - $1,642
49,729
kWh
$6,385
521
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost