IAC logo
IAC Assessment: IC0022
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0022
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2001
Principal Product Stamped Metal Parts
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 47
Plant Area (Sq.Ft.) 36,500
Annual Production 50,000,000 Pieces
Production Hrs. Annual 4,590
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,553 422,649 kWh $0.04
Electricity Demand $17,949 1,447 kW-months/year $12.40
Electricity Fees $5,589 - $ -
Natural Gas $17,934 1,870 MMBtu $9.59
TOTAL ENERGY COSTS $2,140
RECOMMENDED SAVINGS* $34,629 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,742
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,251
Cost:
$12,135
$1,836 34,003 $1,193 96 - - - - - - $222 - $1,836
34,003
kWh
$1,193
96
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$222
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,542
Cost:
$2,500
$1,578 29,242 $964 78 - - - - - - - - $1,578
29,242
kWh
$964
78
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$5,334
Cost:
$820
- - - - $5,334 556 - - - - - - -
-
kWh
-
-
kW-months/year
$5,334
556
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,800
Cost:
$3,280
- - $1,800 145 - - - - - - - - -
-
kWh
$1,800
145
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$6,502
Cost:
$6,300
- - - - - - $6,502 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,502
-
$
-
-
$
-
-
$
06: 4.447 AUTOMATE PAYROLL SYSTEM Savings:
$15,200
Cost:
$4,900
- - - - - - $8,300 - $6,900 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,300
-
$
$6,900
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$34,629
Cost:
$29,935
$3,414 63,245 $3,957 319 $5,334 556 $14,802 - $6,900 - $222 - $3,414
63,245
kWh
$3,957
319
kW-months/year
$5,334
556
MMBtu
$14,802
-
$
$6,900
-
$
$222
-
$
TOTAL IMPLEMENTED Savings:
$17,742
Cost:
$7,400
$1,578 29,242 $964 78 - - $8,300 - $6,900 - - - $1,578
29,242
kWh
$964
78
kW-months/year
-
-
MMBtu
$8,300
-
$
$6,900
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost