IAC logo
IAC Assessment: IC0025
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0025
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2002
Principal Product Stamped Metal Parts
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $5,000,000-$10,000,000
# of Employees 18
Plant Area (Sq.Ft.) 80,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 2,550
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $11,047 264,971 kWh $0.04
Electricity Demand $16,342 1,354 kW-months/year $12.07
Electricity Fees $3,638 - $ -
Natural Gas $8,056 741 MMBtu $10.87
TOTAL ENERGY COSTS $85,318
RECOMMENDED SAVINGS* $32,667 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,393
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,424
Cost:
$11,068
$1,049 19,064 $1,083 90 $146 - - - $146 - $1,049
19,064
kWh
$1,083
90
kW-months/year
$146
-
$
-
-
$
$146
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,193
Cost:
$1,500
$1,570 28,553 $1,623 134 - - - - - - $1,570
28,553
kWh
$1,623
134
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$213
Cost:
$450
$75 1,356 $138 11 - - - - - - $75
1,356
kWh
$138
11
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,637
Cost:
$3,280
- - $1,637 136 - - - - - - -
-
kWh
$1,637
136
kW-months/year
-
-
$
-
-
$
-
-
$
05: 4.4470 AUTOMATE PAYROLL SYSTEM Savings:
$6,200
Cost:
$3,260
- - - - $3,400 - $2,800 - - - -
-
kWh
-
-
kW-months/year
$3,400
-
$
$2,800
-
$
-
-
$
06: 4.5210 CLEAR AND RENT EXISTING SPACE Savings:
$19,000
Cost:
$765
- - - - - - $19,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$19,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$32,667
Cost:
$20,323
$2,694 48,973 $4,481 371 $3,546 - $21,800 - $146 - $2,694
48,973
kWh
$4,481
371
kW-months/year
$3,546
-
$
$21,800
-
$
$146
-
$
TOTAL IMPLEMENTED Savings:
$28,393
Cost:
$5,525
$1,570 28,553 $1,623 134 $3,400 - $21,800 - - - $1,570
28,553
kWh
$1,623
134
kW-months/year
$3,400
-
$
$21,800
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost