Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2002 |
Principal Product | Corrugated Boxes |
NAICS | n/a |
SIC | 2653 - Corrugated And Solid Fiber Boxes |
Sales | $50,000,000-$100,000,000 |
# of Employees | 225 |
Plant Area (Sq.Ft.) | 235,000 |
Annual Production | 6,000 Thousand Feet |
Production Hrs. Annual | 4,798 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $136,806 | 3,776,692 | kWh | $0.04 |
Electricity Demand | $155,500 | 13,225 | kW-months/year | $11.76 |
Electricity Fees | $74,393 | - | $ | - |
Natural Gas | $583,090 | 88,511 | MMBtu | $6.59 |
TOTAL ENERGY COSTS | $903,289 | |||
RECOMMENDED SAVINGS* | $390,604 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $89,888 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,907 Cost: $3,610 |
- | - | - | - | $1,907 | 280 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,907 280 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $9,300 Cost: $1,320 |
- | - | - | - | $9,300 | 1,360 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,300 1,360 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $10,646 Cost: $900 |
- | - | - | - | $10,646 | 1,561 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,646 1,561 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $24,828 Cost: $3,000 |
$14,332 | 304,958 | $10,496 | 763 | - | - | - | - | - | - | - | - |
$14,332 304,958 kWh |
$10,496 763 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $14,179 Cost: $1,500 |
- | - | - | - | $14,179 | 2,079 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$14,179 2,079 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $36,712 Cost: $36,036 |
- | - | - | - | $36,712 | 5,383 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$36,712 5,383 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,616 Cost: $906 |
- | - | - | - | $1,616 | 237 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,616 237 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $18,000 Cost: $3,280 |
- | - | $18,000 | 1,322 | - | - | - | - | - | - | - | - |
- - kWh |
$18,000 1,322 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,753 Cost: $49,560 |
$9,017 | 191,843 | $6,602 | 480 | - | - | $(-947) | - | - | - | $81 | - |
$9,017 191,843 kWh |
$6,602 480 kW-months/year |
- - MMBtu |
$(-947) - $ |
- - $ |
$81 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,519 Cost: $20,549 |
$2,139 | 45,514 | $1,566 | 114 | - | - | $121 | - | - | - | $693 | - |
$2,139 45,514 kWh |
$1,566 114 kW-months/year |
- - MMBtu |
$121 - $ |
- - $ |
$693 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,182 Cost: $4,751 |
$391 | 8,313 | $489 | 36 | - | - | $278 | - | - | - | $24 | - |
$391 8,313 kWh |
$489 36 kW-months/year |
- - MMBtu |
$278 - $ |
- - $ |
$24 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $962 Cost: $2,112 |
$769 | 16,366 | $193 | 14 | - | - | - | - | - | - | - | - |
$769 16,366 kWh |
$193 14 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.426 MODIFY WORKLOAD |
Savings: $150,000 Cost: $32,000 |
- | - | - | - | - | - | $94,000 | - | $56,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$94,000 - $ |
$56,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $102,000 Cost: $8,500 |
- | - | - | - | - | - | - | - | $102,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$102,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $390,604 Cost: $168,024 |
$26,648 | 566,994 | $37,346 | 2,729 | $74,360 | 10,900 | $93,452 | - | $158,000 | - | $798 | - | $26,648 566,994 kWh |
$37,346 2,729 kW-months/year |
$74,360 10,900 MMBtu |
$93,452 - $ |
$158,000 - $ |
$798 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $89,888 Cost: $45,952 |
$14,332 | 304,958 | $10,496 | 763 | $65,060 | 9,540 | - | - | - | - | - | - | $14,332 304,958 kWh |
$10,496 763 kW-months/year |
$65,060 9,540 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost |