Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2002 |
Principal Product | Trade Bindery |
NAICS | n/a |
SIC | 2789 - Bookbinding And Related Work |
Sales | $5,000,000-$10,000,000 |
# of Employees | 87 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 30,000,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $32,301 | 840,366 | kWh | $0.04 |
Electricity Demand | $8,538 | 2,468 | kW-months/year | $3.46 |
Electricity Fees | $24,104 | - | $ | - |
Natural Gas | $40,524 | 4,572 | MMBtu | $8.86 |
TOTAL ENERGY COSTS | $65,512 | |||
RECOMMENDED SAVINGS* | $43,909 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,566 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,466 Cost: $800 |
$2,245 | 34,016 | $221 | 64 | - | - | - | - | - | - |
$2,245 34,016 kWh |
$221 64 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,405 Cost: $30,975 |
$14,448 | 218,912 | $1,038 | 300 | - | - | $(-759) | - | $(-322) | - |
$14,448 218,912 kWh |
$1,038 300 kW-months/year |
- - MMBtu |
$(-759) - $ |
$(-322) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,990 Cost: $8,449 |
$2,407 | 36,477 | $173 | 50 | - | - | $128 | - | $282 | - |
$2,407 36,477 kWh |
$173 50 kW-months/year |
- - MMBtu |
$128 - $ |
$282 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,772 Cost: $7,610 |
$6,336 | 65,998 | $436 | 98 | - | - | - | - | - | - |
$6,336 65,998 kWh |
$436 98 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $677 Cost: - |
$573 | 8,689 | $104 | 30 | - | - | - | - | - | - |
$573 8,689 kWh |
$104 30 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $5,715 Cost: $18,850 |
- | - | - | - | $5,715 | 645 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,715 645 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $461 Cost: $581 |
- | - | - | - | $461 | 52 | - | - | - | - |
- - kWh |
- - kW-months/year |
$461 52 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS |
Savings: $10,423 Cost: - |
- | - | - | - | - | - | $10,400 | - | $23 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$10,400 - $ |
$23 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $43,909 Cost: $67,265 |
$26,009 | 364,092 | $1,972 | 542 | $6,176 | 697 | $9,769 | - | $(-17) | - | $26,009 364,092 kWh |
$1,972 542 kW-months/year |
$6,176 697 MMBtu |
$9,769 - $ |
$(-17) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,566 Cost: $800 |
$2,818 | 42,705 | $325 | 94 | - | - | $10,400 | - | $23 | - | $2,818 42,705 kWh |
$325 94 kW-months/year |
- - MMBtu |
$10,400 - $ |
$23 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |