IAC logo
IAC Assessment: IC0045
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0045
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2002
Principal Product Gifts and Collectibles
NAICS n/a
SIC 3269 - Pottery Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 440,000
Annual Production 8,300,000 Pieces
Production Hrs. Annual 4,080
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $222,834 5,562,148 kWh $0.04
Electricity Demand $167,121 13,544 kW-months/year $12.34
Electricity Fees $528 - $ -
Natural Gas $90,362 20,974 MMBtu $4.31
TOTAL ENERGY COSTS $486,345
RECOMMENDED SAVINGS* $68,035 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$7,422
Cost:
$1,320
$3,170 79,257 $2,876 233 - - - - $505 - $871 - $3,170
79,257
kWh
$2,876
233
kW-months/year
-
-
$
-
-
MMBtu
$505
-
$
$871
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,857
Cost:
$7,199
$865 21,637 $365 30 - - - - $880 - $747 - $865
21,637
kWh
$365
30
kW-months/year
-
-
$
-
-
MMBtu
$880
-
$
$747
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,831
Cost:
$62,835
$7,787 194,665 $7,065 573 - - - - $(-717) - $(-304) - $7,787
194,665
kWh
$7,065
573
kW-months/year
-
-
$
-
-
MMBtu
$(-717)
-
$
$(-304)
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,970
Cost:
$12,088
$3,650 91,228 $1,320 107 - - - - - - - - $3,650
91,228
kWh
$1,320
107
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$251
Cost:
$223
$127 3,173 $124 10 - - - - - - - - $127
3,173
kWh
$124
10
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$166
Cost:
$635
$87 2,179 $79 6 - - - - - - - - $87
2,179
kWh
$79
6
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$910
Cost:
$625
$453 11,313 $457 37 - - - - - - - - $453
11,313
kWh
$457
37
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$990
Cost:
$734
- - - - - - $990 230 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$990
230
MMBtu
-
-
$
-
-
$
09: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$36,638
Cost:
-
- - $(-11,024) - $47,662 - - - - - - - -
-
kWh
$(-11,024)
-
kW-months/year
$47,662
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$68,035
Cost:
$85,659
$16,139 403,452 $1,262 996 $47,662 - $990 230 $668 - $1,314 - $16,139
403,452
kWh
$1,262
996
kW-months/year
$47,662
-
$
$990
230
MMBtu
$668
-
$
$1,314
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $