IAC Assessment: IC0064
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0064
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2003
Principal Product Ground Engaging Tools
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $5,000,000-$10,000,000
# of Employees 56
Plant Area (Sq.Ft.) 104,061
Annual Production 64,800,000 Pounds
Production Hrs. Annual 6,120
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $188,281 4,775,774 kWh $0.04
Electricity Demand $105,330 10,915 kW-months/year $9.65
Electricity Fees $33,503 - $ -
Natural Gas $1,317,745 228,548 MMBtu $5.77
TOTAL ENERGY COSTS $1,652,403
RECOMMENDED SAVINGS* $65,553 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,084
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,915
Cost:
$20,915
$10,490 276,061 $7,411 74 - - $(-219) - $233 - $10,490
276,061
kWh
$7,411
74
kW-months/year
-
-
MMBtu
$(-219)
-
$
$233
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,084
Cost:
$36,178
$4,294 112,999 $2,790 204 - - - - - - $4,294
112,999
kWh
$2,790
204
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$17,626
Cost:
$2,500
- - - - $23,144 4,011 $(-5,518) - - - -
-
kWh
-
-
kW-months/year
$23,144
4,011
MMBtu
$(-5,518)
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,718
Cost:
$8,856
$2,718 71,523 - - - - - - - - $2,718
71,523
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,210
Cost:
$85,743
$7,968 209,700 $12,242 894 - - - - - - $7,968
209,700
kWh
$12,242
894
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$65,553
Cost:
$154,192
$25,470 670,283 $22,443 1,172 $23,144 4,011 $(-5,737) - $233 - $25,470
670,283
kWh
$22,443
1,172
kW-months/year
$23,144
4,011
MMBtu
$(-5,737)
-
$
$233
-
$
TOTAL IMPLEMENTED Savings:
$7,084
Cost:
$36,178
$4,294 112,999 $2,790 204 - - - - - - $4,294
112,999
kWh
$2,790
204
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost