IAC logo
IAC Assessment: IC0082
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0082
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2004
Principal Product Alluminum Ingots / Sows
NAICS 331314 - Secondary Smelting and Alloying of Aluminum
SIC 3341 - Secondary Nonferrous Metals
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 187,700
Annual Production 22,000 Tons
Production Hrs. Annual 8,064
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $222,785 6,999,772 kWh $0.03
Electricity Demand $67,648 18,159 kW-months/year $3.73
Electricity Fees $225,408 - $ -
Natural Gas $1,375,837 310,858 MMBtu $4.43
TOTAL ENERGY COSTS $1,891,678
RECOMMENDED SAVINGS* $754,246 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $516,722
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$158,811
Cost:
-
- - - - $158,811 35,849 - - - - -
-
kWh
-
-
kW-months/year
$158,811
35,849
MMBtu
-
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$212,513
Cost:
$1,533
$(-4,949) (-81,129) $(-450) (-121) $217,912 49,190 - - - - $(-4,949)
(-81,129)
kWh
$(-450)
(-121)
kW-months/year
$217,912
49,190
MMBtu
-
-
$
-
-
$
03: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$295,385
Cost:
$90,783
$21,078 345,540 $1,950 577 $373,157 84,234 - - $(-100,800) - $21,078
345,540
kWh
$1,950
577
kW-months/year
$373,157
84,234
MMBtu
-
-
$
$(-100,800)
-
$
04: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$54,932
Cost:
$8,421
- - - - $54,932 12,400 - - - - -
-
kWh
-
-
kW-months/year
$54,932
12,400
MMBtu
-
-
$
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$7,283
Cost:
$1,450
- - - - $7,283 1,644 - - - - -
-
kWh
-
-
kW-months/year
$7,283
1,644
MMBtu
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$24,495
Cost:
$470,000
$21,575 353,753 $2,920 783 - - - - - - $21,575
353,753
kWh
$2,920
783
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$311
Cost:
$282,150
$278 4,562 $33 9 - - - - - - $278
4,562
kWh
$33
9
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$516
Cost:
$600,000
$271 4,441 $22 6 - - $81 - $142 - $271
4,441
kWh
$22
6
kW-months/year
-
-
MMBtu
$81
-
$
$142
-
$
TOTAL RECOMMENDED Savings:
$754,246
Cost:
$1,454,337
$38,253 627,167 $4,475 1,254 $812,095 183,317 $81 - $(-100,658) - $38,253
627,167
kWh
$4,475
1,254
kW-months/year
$812,095
183,317
MMBtu
$81
-
$
$(-100,658)
-
$
TOTAL IMPLEMENTED Savings:
$516,722
Cost:
$382,804
$21,356 350,102 $1,983 586 $594,183 134,127 - - $(-100,800) - $21,356
350,102
kWh
$1,983
586
kW-months/year
$594,183
134,127
MMBtu
-
-
$
$(-100,800)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes