Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2004 |
Principal Product | Furniture |
NAICS | 337211 - Wood Office Furniture Manufacturing |
SIC | 2521 - Wood Office Furniture |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 185,000 |
Annual Production | 24,000 Pieces |
Production Hrs. Annual | 4,500 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $113,801 | 4,265,327 | kWh | $0.03 |
Electricity Demand | $120,733 | 12,876 | kW-months/year | $9.38 |
Electricity Fees | $37,836 | - | $ | - |
Natural Gas | $152,383 | 21,022 | MMBtu | $7.25 |
TOTAL ENERGY COSTS | $424,753 | |||
RECOMMENDED SAVINGS* | $27,608 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,451 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $2,168 Cost: $3,600 |
- | - | - | - | $2,168 | 299 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,168 299 MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $14,864 Cost: $89,448 |
$14,464 | 490,512 | $400 | 2,535 | - | - | - | - | - | - | - | - |
$14,464 490,512 kWh |
$400 2,535 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,546 Cost: $700 |
$901 | 25,783 | $645 | 69 | - | - | - | - | - | - | - | - |
$901 25,783 kWh |
$645 69 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $737 Cost: - |
$427 | 12,191 | $310 | 33 | - | - | - | - | - | - | - | - |
$427 12,191 kWh |
$310 33 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $5,595 Cost: $34,679 |
$3,265 | 93,925 | $2,330 | 249 | - | - | - | - | - | - | - | - |
$3,265 93,925 kWh |
$2,330 249 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $803 Cost: $300 |
- | - | - | - | - | - | $803 | 349,325 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$803 349,325 Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $1,895 Cost: $8,597 |
$678 | 19,396 | $718 | 77 | - | - | - | - | $92 | - | $407 | - |
$678 19,396 kWh |
$718 77 kW-months/year |
- - MMBtu |
- - Tgal |
$92 - $ |
$407 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,608 Cost: $137,324 |
$19,735 | 641,807 | $4,403 | 2,963 | $2,168 | 299 | $803 | 349,325 | $92 | - | $407 | - | $19,735 641,807 kWh |
$4,403 2,963 kW-months/year |
$2,168 299 MMBtu |
$803 349,325 Tgal |
$92 - $ |
$407 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,451 Cost: $4,300 |
$1,328 | 37,974 | $955 | 102 | $2,168 | 299 | - | - | - | - | - | - | $1,328 37,974 kWh |
$955 102 kW-months/year |
$2,168 299 MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost |