Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2005 |
Principal Product | Road Construction Equipment, Automotive Lenses, and Caster Wheels |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 95 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 12,000,000 Pounds |
Production Hrs. Annual | 6,144 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $352,756 | 6,059,019 | kWh | $0.06 |
Electricity Demand | $63,629 | 14,372 | kW-months/year | $4.43 |
Electricity Fees | $6,437 | - | $ | - |
Natural Gas | $32,110 | 4,256 | MMBtu | $7.54 |
TOTAL ENERGY COSTS | $454,932 | |||
RECOMMENDED SAVINGS* | $35,773 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,675 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $6,719 Cost: $35,000 |
$8,360 | 144,133 | $1,183 | 267 | - | - | - | - | $(-2,824) | - |
$8,360 144,133 kWh |
$1,183 267 kW-months/year |
- - MMBtu |
- - $ |
$(-2,824) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,085 Cost: $66,591 |
$15,998 | 275,819 | $2,087 | 471 | - | - | - | - | - | - |
$15,998 275,819 kWh |
$2,087 471 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $246 Cost: - |
$210 | 3,625 | $36 | 8 | - | - | - | - | - | - |
$210 3,625 kWh |
$36 8 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,577 Cost: $1,200 |
$2,129 | 36,696 | $448 | 101 | - | - | - | - | - | - |
$2,129 36,696 kWh |
$448 101 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $6,852 Cost: $1,520 |
$5,963 | 102,821 | $889 | 200 | - | - | - | - | - | - |
$5,963 102,821 kWh |
$889 200 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $671 Cost: $48 |
- | - | - | - | $671 | 89 | - | - | - | - |
- - kWh |
- - kW-months/year |
$671 89 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $92 Cost: $364 |
$87 | 1,500 | $5 | 1 | - | - | - | - | - | - |
$87 1,500 kWh |
$5 1 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $531 Cost: $1,121 |
$173 | 2,971 | $17 | 4 | - | - | $84 | - | $257 | - |
$173 2,971 kWh |
$17 4 kW-months/year |
- - MMBtu |
$84 - $ |
$257 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,773 Cost: $105,844 |
$32,920 | 567,565 | $4,665 | 1,052 | $671 | 89 | $84 | - | $(-2,567) | - | $32,920 567,565 kWh |
$4,665 1,052 kW-months/year |
$671 89 MMBtu |
$84 - $ |
$(-2,567) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,675 Cost: $2,720 |
$8,302 | 143,142 | $1,373 | 309 | - | - | - | - | - | - | $8,302 143,142 kWh |
$1,373 309 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |