Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2005 |
Principal Product | Epoxies and Resins |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 87,120 |
Annual Production | 0 Thousand Gallons |
Production Hrs. Annual | 8,544 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $129,695 | 3,304,731 | kWh | $0.04 |
Electricity Demand | $88,262 | 7,286 | kW-months/year | $12.11 |
Electricity Fees | $2,868 | - | $ | - |
Natural Gas | $525,368 | 73,220 | MMBtu | $7.18 |
TOTAL ENERGY COSTS | $746,193 | |||
RECOMMENDED SAVINGS* | $105,621 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $85,290 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $60,808 Cost: $100,000 |
- | - | - | - | $60,808 | 8,662 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$60,808 8,662 MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $7,211 Cost: $2,000 |
- | - | - | - | $7,211 | 1,540 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,211 1,540 MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $17,271 Cost: $3,900 |
- | - | - | - | $17,165 | 2,445 | - | - | - | - | $106 | - |
- - kWh |
- - kW-months/year |
$17,165 2,445 MMBtu |
- - $ |
- - $ |
$106 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2124 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK |
Savings: $12,910 Cost: $900 |
- | - | - | - | $12,910 | 1,839 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$12,910 1,839 MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $3,728 Cost: $42,000 |
- | - | - | - | $3,728 | 531 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,728 531 MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $94 Cost: $713 |
$94 | 2,421 | - | - | - | - | - | - | - | - | - | - |
$94 2,421 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $255 Cost: $714 |
$94 | 2,409 | $40 | 3 | - | - | $45 | - | $76 | - | - | - |
$94 2,409 kWh |
$40 3 kW-months/year |
- - MMBtu |
$45 - $ |
$76 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,344 Cost: $13,017 |
$1,514 | 38,844 | $954 | 79 | - | - | $162 | - | $714 | - | - | - |
$1,514 38,844 kWh |
$954 79 kW-months/year |
- - MMBtu |
$162 - $ |
$714 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $105,621 Cost: $163,244 |
$1,702 | 43,674 | $994 | 82 | $101,822 | 15,017 | $207 | - | $790 | - | $106 | - | $1,702 43,674 kWh |
$994 82 kW-months/year |
$101,822 15,017 MMBtu |
$207 - $ |
$790 - $ |
$106 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $85,290 Cost: $105,900 |
- | - | - | - | $85,184 | 12,647 | - | - | - | - | $106 | - | - - kWh |
- - kW-months/year |
$85,184 12,647 MMBtu |
- - $ |
- - $ |
$106 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption |