IAC logo
IAC Assessment: IC0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2006
Principal Product electronic connectors
NAICS 335931 - Current-Carrying Wiring Device Manufacturing
SIC 3643 - Current-carrying Wiring Devices
Sales >$500,000,000
# of Employees 1,200
Plant Area (Sq.Ft.) 560,000
Annual Production 100,000 Pieces
Production Hrs. Annual 2,250
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $682,791 10,610,494 kWh $0.06
Electricity Fees $16,188 - $ -
Natural Gas $326,000 56,802 MMBtu $5.74
TOTAL ENERGY COSTS $1,024,979
RECOMMENDED SAVINGS* $33,530 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,159
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$14,489
Cost:
$58,358
$14,489 226,384 - - - - - - $14,489
226,384
kWh
-
-
MMBtu
-
-
$
-
-
$
02: 2.1224 REPLACE BOILER Savings:
$10,973
Cost:
$46,865
- - $10,973 1,016 - - - - -
-
kWh
$10,973
1,016
MMBtu
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,130
Cost:
$21,000
$3,130 48,912 - - - - - - $3,130
48,912
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,700
Cost:
-
- - $2,700 250 - - - - -
-
kWh
$2,700
250
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,480
Cost:
$1,791
$1,480 23,127 - - - - - - $1,480
23,127
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$490
Cost:
-
$472 7,381 - - - - $18 - $472
7,381
kWh
-
-
MMBtu
-
-
$
$18
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$268
Cost:
$816
$67 1,051 - - $65 - $136 - $67
1,051
kWh
-
-
MMBtu
$65
-
$
$136
-
$
TOTAL RECOMMENDED Savings:
$33,530
Cost:
$128,830
$19,638 306,855 $13,673 1,266 $65 - $154 - $19,638
306,855
kWh
$13,673
1,266
MMBtu
$65
-
$
$154
-
$
TOTAL IMPLEMENTED Savings:
$19,159
Cost:
$60,149
$16,441 256,892 $2,700 250 - - $18 - $16,441
256,892
kWh
$2,700
250
MMBtu
-
-
$
$18
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost