IAC Assessment: IC0135
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0135
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2007
Principal Product food packaging
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 500
Plant Area (Sq.Ft.) 185,000
Annual Production 20,000 Pieces
Production Hrs. Annual 3,984
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $184,317 1,886,040 kWh $0.10
Electricity Demand $29,326 4,653 kW-months/year $6.30
Natural Gas $16,987 1,892 MMBtu $8.98
TOTAL ENERGY COSTS $236,486
RECOMMENDED SAVINGS* $55,192 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,459
Cost:
$14,076
$6,413 65,485 $1,296 205 $582 - $168 - $6,413
65,485
kWh
$1,296
205
kW-months/year
$582
-
$
$168
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,848
Cost:
$48,465
$21,518 219,517 $3,610 573 $165 - $(-2,445) - $21,518
219,517
kWh
$3,610
573
kW-months/year
$165
-
$
$(-2,445)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$489
Cost:
$228
$269 2,743 $63 10 $162 - $(-5) - $269
2,743
kWh
$63
10
kW-months/year
$162
-
$
$(-5)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$607
Cost:
$1,193
$347 3,548 $31 5 $75 - $154 - $347
3,548
kWh
$31
5
kW-months/year
$75
-
$
$154
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,488
Cost:
$2,904
$1,926 28,323 $562 97 - - - - $1,926
28,323
kWh
$562
97
kW-months/year
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,093
Cost:
$11,558
$1,753 17,883 $340 54 - - - - $1,753
17,883
kWh
$340
54
kW-months/year
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,449
Cost:
$1,380
$3,449 35,203 - - - - - - $3,449
35,203
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$945
Cost:
-
$945 9,643 - - - - - - $945
9,643
kWh
-
-
kW-months/year
-
-
$
-
-
$
09: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$2,210
Cost:
$4,835
$2,210 22,542 - - - - - - $2,210
22,542
kWh
-
-
kW-months/year
-
-
$
-
-
$
10: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,755
Cost:
-
- - - - $10,755 - - - -
-
kWh
-
-
kW-months/year
$10,755
-
$
-
-
$
11: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$849
Cost:
-
- - - - $849 - - - -
-
kWh
-
-
kW-months/year
$849
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$55,192
Cost:
$84,639
$38,830 404,887 $5,902 944 $12,588 - $(-2,128) - $38,830
404,887
kWh
$5,902
944
kW-months/year
$12,588
-
$
$(-2,128)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost