IAC logo
IAC Assessment: IC0145
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0145
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2008
Principal Product Raw Materials
NAICS 332991 - Ball and Roller Bearing Manufacturing
SIC 3562 - Ball And Roller Bearings
Sales $1,000,000-$5,000,000
# of Employees 130
Plant Area (Sq.Ft.) 242,088
Annual Production 245,000 Pieces
Production Hrs. Annual 3,428
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $145,071 2,293,080 kWh $0.06
Electricity Demand $53,389 5,010 kW-months/year $10.66
Natural Gas $101,871 13,596 MMBtu $7.49
TOTAL ENERGY COSTS $308,387
RECOMMENDED SAVINGS* $77,662 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$57,047
Cost:
$112,631
$38,445 610,231 $20,329 1,907 - - $(-1,658) - $(-69) - $38,445
610,231
kWh
$20,329
1,907
kW-months/year
-
-
MMBtu
$(-1,658)
-
$
$(-69)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$556
Cost:
$4,664
$311 4,913 $182 17 - - - - $63 - $311
4,913
kWh
$182
17
kW-months/year
-
-
MMBtu
-
-
$
$63
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,604
Cost:
$14,300
$3,106 49,291 $2,147 201 - - $129 - $(-778) - $3,106
49,291
kWh
$2,147
201
kW-months/year
-
-
MMBtu
$129
-
$
$(-778)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,134
Cost:
$391
$569 9,024 $416 39 - - $172 - $(-23) - $569
9,024
kWh
$416
39
kW-months/year
-
-
MMBtu
$172
-
$
$(-23)
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,958
Cost:
$14,655
$4,813 76,396 $3,145 295 - - - - - - $4,813
76,396
kWh
$3,145
295
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$466
Cost:
$3,785
$242 3,842 $224 21 - - - - - - $242
3,842
kWh
$224
21
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$2,172
Cost:
$4,500
- - - - $2,172 270 - - - - -
-
kWh
-
-
kW-months/year
$2,172
270
MMBtu
-
-
$
-
-
$
08: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$3,114
Cost:
-
$508 8,072 $416 39 $2,082 276 $108 - - - $508
8,072
kWh
$416
39
kW-months/year
$2,082
276
MMBtu
$108
-
$
-
-
$
09: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$611
Cost:
-
$227 3,600 $384 36 - - - - - - $227
3,600
kWh
$384
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$77,662
Cost:
$154,926
$48,221 765,369 $27,243 2,555 $4,254 546 $(-1,249) - $(-807) - $48,221
765,369
kWh
$27,243
2,555
kW-months/year
$4,254
546
MMBtu
$(-1,249)
-
$
$(-807)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $