IAC logo
IAC Assessment: IC0170
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0170
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2010
Principal Product Plastic Bottles
NAICS 326160 - Plastics Bottle Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 34
Plant Area (Sq.Ft.) 55,000
Annual Production 126,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $674,653 9,290,085 kWh $0.07
Electricity Demand $108,175 19,231 kW-months/year $5.63
Natural Gas $20,506 2,915 MMBtu $7.03
TOTAL ENERGY COSTS $803,334
RECOMMENDED SAVINGS* $14,915 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,278
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$376
Cost:
$814
$288 3,935 $46 8 $25 - $17 - $288
3,935
kWh
$46
8
kW-months/year
$25
-
$
$17
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,095
Cost:
-
$1,566 21,451 $295 52 - - $234 - $1,566
21,451
kWh
$295
52
kW-months/year
-
-
$
$234
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$414
Cost:
$1,176
$356 4,881 $58 10 - - - - $356
4,881
kWh
$58
10
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$85
Cost:
$68
$34 463 - - $34 - $17 - $34
463
kWh
-
-
kW-months/year
$34
-
$
$17
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$245
Cost:
$62
$118 1,622 $40 7 $3 - $84 - $118
1,622
kWh
$40
7
kW-months/year
$3
-
$
$84
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$56
Cost:
-
$50 691 $6 1 - - - - $50
691
kWh
$6
1
kW-months/year
-
-
$
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,115
Cost:
$12,247
$4,411 60,410 $704 125 - - - - $4,411
60,410
kWh
$704
125
kW-months/year
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,084
Cost:
$1,150
$4,084 55,950 - - - - - - $4,084
55,950
kWh
-
-
kW-months/year
-
-
$
-
-
$
09: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$916
Cost:
-
$916 12,533 - - - - - - $916
12,533
kWh
-
-
kW-months/year
-
-
$
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,297
Cost:
$84
$80 1,100 $1,217 216 - - - - $80
1,100
kWh
$1,217
216
kW-months/year
-
-
$
-
-
$
11: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$232
Cost:
-
$131 1,800 $101 18 - - - - $131
1,800
kWh
$101
18
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$14,915
Cost:
$15,601
$12,034 164,836 $2,467 437 $62 - $352 - $12,034
164,836
kWh
$2,467
437
kW-months/year
$62
-
$
$352
-
$
TOTAL IMPLEMENTED Savings:
$11,278
Cost:
$15,455
$10,270 140,663 $915 162 $59 - $34 - $10,270
140,663
kWh
$915
162
kW-months/year
$59
-
$
$34
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost