IAC Assessment: IC0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2011
Principal Product Gears
NAICS 332111 - Iron and Steel Forging
SIC 3462 - Iron And Steel Forgings
Sales $1,000,000-$5,000,000
# of Employees 120
Plant Area (Sq.Ft.) 157,950
Annual Production 4,000,000 Pieces
Production Hrs. Annual 7,224
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $824,370 17,687,015 kWh $0.05
Electricity Demand $391,268 56,148 kW-months/year $6.97
Electricity Fees $4,228 - $ -
Natural Gas $120,156 17,272 MMBtu $6.96
TOTAL ENERGY COSTS $1,372,555
RECOMMENDED SAVINGS* $56,571 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$537
Cost:
$695
$198 3,986 $40 6 - - $299 - $198
3,986
kWh
$40
6
kW-months/year
-
-
MMBtu
$299
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,115
Cost:
$3,977
$654 13,938 $190 27 - - $271 - $654
13,938
kWh
$190
27
kW-months/year
-
-
MMBtu
$271
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$963
Cost:
$1,463
$773 16,462 $190 27 - - - - $773
16,462
kWh
$190
27
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,842
Cost:
$32,631
$11,738 249,710 $2,890 415 - - $(-1,786) - $11,738
249,710
kWh
$2,890
415
kW-months/year
-
-
MMBtu
$(-1,786)
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$766
Cost:
$350
- - - - $766 110 - - -
-
kWh
-
-
kW-months/year
$766
110
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,423
Cost:
$2,049
$4,350 92,557 $1,073 154 - - - - $4,350
92,557
kWh
$1,073
154
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$6,206
Cost:
$11,658
$4,979 105,952 $1,227 180 - - - - $4,979
105,952
kWh
$1,227
180
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$26,660
Cost:
$128,000
$21,390 455,112 $5,270 756 - - - - $21,390
455,112
kWh
$5,270
756
kW-months/year
-
-
MMBtu
-
-
$
09: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,770
Cost:
$140
- - $1,770 254 - - - - -
-
kWh
$1,770
254
kW-months/year
-
-
MMBtu
-
-
$
10: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$289
Cost:
-
$240 5,100 $49 7 - - - - $240
5,100
kWh
$49
7
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$56,571
Cost:
$180,963
$44,322 942,817 $12,699 1,825 $766 110 $(-1,216) - $44,322
942,817
kWh
$12,699
1,825
kW-months/year
$766
110
MMBtu
$(-1,216)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes