IAC Assessment: IC0201
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0201
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2018
Principal Product Wastewater Treatment Facility
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 29
Plant Area (Sq.Ft.) 1,061,340
Annual Production 2,409,000 Units
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $233,209 5,300,207 kWh $0.04
Electricity Demand $39,074 19,793 kW-months/year $1.97
Electricity Fees $45,923 - $ -
Natural Gas $27,049 5,082 MMBtu $5.32
TOTAL ENERGY COSTS $345,255
RECOMMENDED SAVINGS* $226,157 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $216,698
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$208,328
Cost:
$305,915
$179,798 3,802,830 $28,530 22,764 $179,798
3,802,830
kWh
$28,530
22,764
kW-months/year
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$8,691
Cost:
$11,397
$8,278 165,564 $413 227 $8,278
165,564
kWh
$413
227
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,439
Cost:
$9,545
$5,439 113,267 - - $5,439
113,267
kWh
-
-
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,551
Cost:
$2,023
$1,423 30,091 $128 71 $1,423
30,091
kWh
$128
71
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,380
Cost:
$422
$1,310 27,698 $70 39 $1,310
27,698
kWh
$70
39
kW-months/year
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$768
Cost:
-
- - $768 504 -
-
kWh
$768
504
kW-months/year
TOTAL RECOMMENDED Savings:
$226,157
Cost:
$329,302
$196,248 4,139,450 $29,909 23,605 $196,248
4,139,450
kWh
$29,909
23,605
kW-months/year
TOTAL IMPLEMENTED Savings:
$216,698
Cost:
$317,905
$187,970 3,973,886 $28,728 22,874 $187,970
3,973,886
kWh
$28,728
22,874
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand