IAC logo
IAC Assessment: IC0211
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0211
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2019
Principal Product Pipe Coatings
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 75,000
Annual Production 3,500 Thousand Feet
Production Hrs. Annual 6,257
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $516,684 7,381,200 kWh $0.07
Electricity Demand $580,773 50,545 kW-months/year $11.49
Natural Gas $223,136 45,534 MMBtu $4.90
TOTAL ENERGY COSTS $1,320,593
RECOMMENDED SAVINGS* $79,828 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $73,829
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$5,999
Cost:
$9,168
- - - - - - $5,999 1,224 -
-
kWh
-
-
kW-months/year
-
-
$
$5,999
1,224
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,310
Cost:
$18,709
$4,513 64,475 $797 69 - - - - $4,513
64,475
kWh
$797
69
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,768
Cost:
$42,206
$14,358 205,111 $11,410 993 - - - - $14,358
205,111
kWh
$11,410
993
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,829
Cost:
$4,500
$2,948 42,115 $2,881 252 - - - - $2,948
42,115
kWh
$2,881
252
kW-months/year
-
-
$
-
-
MMBtu
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$36,922
Cost:
-
- - - - $36,922 - - - -
-
kWh
-
-
kW-months/year
$36,922
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$79,828
Cost:
$74,583
$21,819 311,701 $15,088 1,314 $36,922 - $5,999 1,224 $21,819
311,701
kWh
$15,088
1,314
kW-months/year
$36,922
-
$
$5,999
1,224
MMBtu
TOTAL IMPLEMENTED Savings:
$73,829
Cost:
$65,415
$21,819 311,701 $15,088 1,314 $36,922 - - - $21,819
311,701
kWh
$15,088
1,314
kW-months/year
$36,922
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas