IAC logo
IAC Assessment: IC0301
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0301
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2024
Principal Product Aggregate Equipment
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $50,000,000-$100,000,000
# of Employees 85
Plant Area (Sq.Ft.) 55,000
Annual Production 80 Units
Production Hrs. Annual 4,420
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,616 945,421 kWh $0.04
Electricity Demand $29,592 2,919 kW-months/year $10.14
Electricity Fees $1,885 - $ -
Natural Gas $41,193 6,488 MMBtu $6.35
TOTAL ENERGY COSTS $108,286
RECOMMENDED SAVINGS* $81,101 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$24,209
Cost:
$186,605
$9,480 249,478 $14,728 1,453 - - - - $9,480
249,478
kWh
$14,728
1,453
kW-months/year
-
-
MMBtu
-
-
$
02: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$26,388
Cost:
$3,600
- - - - - - $26,388 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$26,388
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,886
Cost:
$205
$80 2,096 $2,806 277 - - - - $80
2,096
kWh
$2,806
277
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,652
Cost:
-
$2,697 70,984 $1,954 193 - - - - $2,697
70,984
kWh
$1,954
193
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,042
Cost:
$205
$91 2,406 $1,950 192 - - - - $91
2,406
kWh
$1,950
192
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,487
Cost:
-
$2,602 68,466 $1,885 186 - - - - $2,602
68,466
kWh
$1,885
186
kW-months/year
-
-
MMBtu
-
-
$
07: 2.5113 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING Savings:
$13,766
Cost:
$3,820
$(-185) (-4,875) $(-912) (-90) $14,863 2,341 - - $(-185)
(-4,875)
kWh
$(-912)
(-90)
kW-months/year
$14,863
2,341
MMBtu
-
-
$
08: 2.1115 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS Savings:
$2,673
Cost:
$890
- - - - $2,673 421 - - -
-
kWh
-
-
kW-months/year
$2,673
421
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$81,101
Cost:
$195,325
$14,765 388,555 $22,412 2,210 $17,536 2,762 $26,388 - $14,765
388,555
kWh
$22,412
2,210
kW-months/year
$17,536
2,762
MMBtu
$26,388
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost