Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Indiana University-Purdue University |
---|---|
Assessment Year | 2014 |
Principal Product | Sour Punch, Snaps, Super Ropes Brand Confections |
NAICS | 311340 - Nonchocolate Confectionery Manufacturing |
SIC | 2064 - Candy & Other Confectionery Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 255 |
Plant Area (Sq.Ft.) | 280,000 |
Annual Production | 16,000,000 Pieces |
Production Hrs. Annual | 5,736 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $300,930 | 5,168,160 | kWh | $0.06 |
Electricity Demand | $135,669 | 11,286 | kW-months/year | $12.02 |
Electricity Fees | $9,969 | - | $ | - |
Natural Gas | $122,958 | 23,002 | MMBtu | $5.35 |
TOTAL ENERGY COSTS | $569,526 | |||
RECOMMENDED SAVINGS* | $49,966 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $21,826 Cost: - |
$21,068 | 361,368 | $758 | 63 | - | - |
$21,068 361,368 kWh |
$758 63 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $251 Cost: - |
$251 | 4,300 | - | - | - | - |
$251 4,300 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,844 Cost: $59 |
$2,844 | 48,785 | - | - | - | - |
$2,844 48,785 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $66 Cost: $13 |
$46 | 792 | $20 | 2 | - | - |
$46 792 kWh |
$20 2 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $43 Cost: $30 |
$43 | 743 | - | - | - | - |
$43 743 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS |
Savings: $2,202 Cost: $1,970 |
$1,538 | 26,386 | $664 | 55 | - | - |
$1,538 26,386 kWh |
$664 55 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2311 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS |
Savings: $20,119 Cost: $16,444 |
$(-6,128) | (-105,120) | - | - | $26,247 | 4,906 |
$(-6,128) (-105,120) kWh |
- - kW-months/year |
$26,247 4,906 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $2,491 Cost: $2,716 |
$1,533 | 26,300 | $958 | 80 | - | - |
$1,533 26,300 kWh |
$958 80 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $124 Cost: $245 |
$87 | 1,486 | $37 | 3 | - | - |
$87 1,486 kWh |
$37 3 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $49,966 Cost: $21,477 |
$21,282 | 365,040 | $2,437 | 202 | $26,247 | 4,906 | $21,282 365,040 kWh |
$2,437 202 kW-months/year |
$26,247 4,906 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |