IAC Assessment: IP0039
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0039
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2015
Principal Product Telecommunications and Automotive Assemblies
NAICS 334210 - Telephone Apparatus Manufacturing
SIC 3661 - Telephone And Telegraph Apparatus
Sales >$500,000,000
# of Employees 700
Plant Area (Sq.Ft.) 113,280
Annual Production 15,000 Pieces
Production Hrs. Annual 4,680
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,172 1,011,982 kWh $0.06
Electricity Demand $31,625 2,650 kW-months/year $11.93
Electricity Fees $6,468 - $ -
Natural Gas $9,462 1,132 MMBtu $8.36
TOTAL ENERGY COSTS $112,727
RECOMMENDED SAVINGS* $20,743 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,933
Cost:
-
$1,703 26,958 $230 19 - - $1,703
26,958
kWh
$230
19
kW-months/year
-
-
MMBtu
02: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$6,224
Cost:
$853
$6,224 98,487 - - - - $6,224
98,487
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$330
Cost:
$128
$330 5,229 - - - - $330
5,229
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,314
Cost:
$1,524
$2,224 35,193 $90 8 - - $2,224
35,193
kWh
$90
8
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,262
Cost:
$3,790
$2,194 34,724 $1,068 89 - - $2,194
34,724
kWh
$1,068
89
kW-months/year
-
-
MMBtu
06: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$6,679
Cost:
$6,839
$1,858 29,400 $8,640 720 $(-3,820) (-457) $1,858
29,400
kWh
$8,640
720
kW-months/year
$(-3,820)
(-457)
MMBtu
TOTAL RECOMMENDED Savings:
$20,743
Cost:
$13,134
$14,533 229,991 $10,029 836 $(-3,820) (-457) $14,533
229,991
kWh
$10,029
836
kW-months/year
$(-3,820)
(-457)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas