IAC logo
IAC Assessment: KG0009
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0009
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1994
Principal Product Variety Bread
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 60,000
Annual Production 488,500,000 Pounds
Production Hrs. Annual 5,200
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,758 2,091,442 kWh $0.07
Natural Gas $108,829 25,650 MMBtu $4.24
TOTAL ENERGY COSTS $245,587
RECOMMENDED SAVINGS* $27,639 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$8,262
Cost:
$2,500
- - $8,262 1,948 -
-
kWh
$8,262
1,948
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,500
Cost:
$2,500
- - $4,500 1,109 -
-
kWh
$4,500
1,109
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,929
Cost:
-
$3,929 68,581 - - $3,929
68,581
kWh
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,984
Cost:
$7,370
$2,984 59,496 - - $2,984
59,496
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,527
Cost:
$8,800
- - $2,527 607 -
-
kWh
$2,527
607
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,017
Cost:
$810
$2,017 60,668 - - $2,017
60,668
kWh
-
-
MMBtu
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,662
Cost:
$300
$1,662 50,117 - - $1,662
50,117
kWh
-
-
MMBtu
08: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$1,387
Cost:
$100
- - $1,387 327 -
-
kWh
$1,387
327
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$371
Cost:
$260
$371 11,137 - - $371
11,137
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,639
Cost:
$22,640
$10,963 249,999 $16,676 3,991 $10,963
249,999
kWh
$16,676
3,991
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas