Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1994
Principal Product Bowling balls
NAICS n/a
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 120,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 2,184
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $228,798 3,927,902 kWh $0.06
Natural Gas $35,607 9,433 MMBtu $3.77
TOTAL ENERGY COSTS $264,405
RECOMMENDED SAVINGS* $31,343 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,560
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$24,209
Cost:
$3,300
$24,209 679,953 $24,209
679,953
kWh
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,343
Cost:
$14,260
$2,343 55,979 $2,343
55,979
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,151
Cost:
$2,099
$2,151 60,668 $2,151
60,668
kWh
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,135
Cost:
$468
$1,135 15,826 $1,135
15,826
kWh
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$857
Cost:
$300
$857 24,326 $857
24,326
kWh
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$648
Cost:
$20
$648 9,086 $648
9,086
kWh
TOTAL RECOMMENDED Savings:
$31,343
Cost:
$20,447
$31,343 845,838 $31,343
845,838
kWh
TOTAL IMPLEMENTED Savings:
$29,560
Cost:
$19,959
$29,560 820,926 $29,560
820,926
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage