IAC Assessment: KG0049
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0049
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1996
Principal Product plastic injection molding
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 42,900
Annual Production 89,250,000 Pieces
Production Hrs. Annual 8,592
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,486 3,804,807 kWh $0.03
Electricity Demand $101,958 7,226 kW-months/year $14.11
Electricity Fees $705 - $ -
TOTAL ENERGY COSTS $446,192
RECOMMENDED SAVINGS* $98,301 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $79,487
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ Tgal $ lb
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$16,652
Cost:
$207
$10,290 323,564 $6,362 456 - - - - $10,290
323,564
kWh
$6,362
456
kW-months/year
-
-
Tgal
-
-
lb
02: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$16,594
Cost:
$5,000
$16,594 296,600 - - - - - - $16,594
296,600
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$14,214
Cost:
$12,880
$9,916 312,427 $4,298 300 - - - - $9,916
312,427
kWh
$4,298
300
kW-months/year
-
-
Tgal
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,057
Cost:
$416
$368 11,723 $689 48 - - - - $368
11,723
kWh
$689
48
kW-months/year
-
-
Tgal
-
-
lb
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$248
Cost:
$300
$153 4,982 $95 7 - - - - $153
4,982
kWh
$95
7
kW-months/year
-
-
Tgal
-
-
lb
06: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$2,707
Cost:
$3,000
- - - - $2,707 335,866 - - -
-
kWh
-
-
kW-months/year
$2,707
335,866
Tgal
-
-
lb
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$44,609
Cost:
$2,000
- - - - - - $44,609 21,420 -
-
kWh
-
-
kW-months/year
-
-
Tgal
$44,609
21,420
lb
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,220
Cost:
-
- - - - - - $2,220 72,800 -
-
kWh
-
-
kW-months/year
-
-
Tgal
$2,220
72,800
lb
TOTAL RECOMMENDED Savings:
$98,301
Cost:
$23,803
$37,321 949,296 $11,444 811 $2,707 335,866 $46,829 94,220 $37,321
949,296
kWh
$11,444
811
kW-months/year
$2,707
335,866
Tgal
$46,829
94,220
lb
TOTAL IMPLEMENTED Savings:
$79,487
Cost:
$18,803
$20,727 652,696 $11,444 811 $2,707 335,866 $44,609 21,420 $20,727
652,696
kWh
$11,444
811
kW-months/year
$2,707
335,866
Tgal
$44,609
21,420
lb
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)