IAC logo
IAC Assessment: KG0050
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0050
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1996
Principal Product newspaper
NAICS n/a
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 144
Plant Area (Sq.Ft.) 31,872
Annual Production 29,500 Pieces
Production Hrs. Annual 7,644
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,697 1,123,974 kWh $0.03
Electricity Demand $47,409 3,360 kW-months/year $14.11
Electricity Fees $2,666 - $ -
TOTAL ENERGY COSTS $86,685
RECOMMENDED SAVINGS* $41,573 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,169
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$24,066
Cost:
$29,950
$9,677 302,462 $14,389 1,020 - - $9,677
302,462
kWh
$14,389
1,020
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,491
Cost:
$1,081
$1,544 48,652 $1,947 138 - - $1,544
48,652
kWh
$1,947
138
kW-months/year
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,090
Cost:
$930
$740 23,154 $350 24 - - $740
23,154
kWh
$350
24
kW-months/year
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$498
Cost:
$600
$293 9,086 $205 14 - - $293
9,086
kWh
$205
14
kW-months/year
-
-
lb
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$314
Cost:
-
$185 5,862 $129 9 - - $185
5,862
kWh
$129
9
kW-months/year
-
-
lb
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$310
Cost:
$20
$181 5,569 $129 9 - - $181
5,569
kWh
$129
9
kW-months/year
-
-
lb
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$6,756
Cost:
-
- - - - $6,756 7,500 -
-
kWh
-
-
kW-months/year
$6,756
7,500
lb
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$4,072
Cost:
-
- - - - $4,072 2,500 -
-
kWh
-
-
kW-months/year
$4,072
2,500
lb
09: 3.7212 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) Savings:
$976
Cost:
-
- - - - $976 36,500 -
-
kWh
-
-
kW-months/year
$976
36,500
lb
TOTAL RECOMMENDED Savings:
$41,573
Cost:
$32,581
$12,620 394,785 $17,149 1,214 $11,804 46,500 $12,620
394,785
kWh
$17,149
1,214
kW-months/year
$11,804
46,500
lb
TOTAL IMPLEMENTED Savings:
$40,169
Cost:
$31,651
$11,695 365,769 $16,670 1,181 $11,804 46,500 $11,695
365,769
kWh
$16,670
1,181
kW-months/year
$11,804
46,500
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)