IAC Assessment: KG0051
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0051
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1996
Principal Product liquid and leaf extract aloe
NAICS n/a
SIC 2844 - Toilet Preparations
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 52,800
Annual Production 31,768,000 Pounds
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,383 1,515,240 kWh $0.03
Electricity Demand $52,150 3,696 kW-months/year $14.11
Electricity Fees $1,411 - $ -
Natural Gas $40,415 16,261 MMBtu $2.49
TOTAL ENERGY COSTS $142,075
RECOMMENDED SAVINGS* $53,959 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,350
Cost:
$3,820
$3,308 105,803 $2,042 144 - - - - - - $3,308
105,803
kWh
$2,042
144
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,473
Cost:
$2,080
$2,763 88,218 $1,710 120 - - - - - - $2,763
88,218
kWh
$1,710
120
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,014
Cost:
$1,052
$2,084 66,530 $1,930 132 - - - - - - $2,084
66,530
kWh
$1,930
132
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,751
Cost:
$1,500
- - - - $2,751 400 - - - - -
-
kWh
-
-
kW-months/year
$2,751
400
MMBtu
-
-
Tgal
-
-
lb
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,859
Cost:
$450
$1,859 59,496 - - - - - - - - $1,859
59,496
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,464
Cost:
$1,120
$672 21,395 $792 60 - - - - - - $672
21,395
kWh
$792
60
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,354
Cost:
-
$837 26,671 $517 36 - - - - - - $837
26,671
kWh
$517
36
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
08: 3.4151 MINIMIZE WATER USAGE Savings:
$27,720
Cost:
$3,283
- - - - - - $27,720 6,600,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$27,720
6,600,000
Tgal
-
-
lb
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,930
Cost:
$75
- - - - - - - - $2,930 19,855 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,930
19,855
lb
10: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,044
Cost:
-
- - - - - - - - $2,044 18,050 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,044
18,050
lb
TOTAL RECOMMENDED Savings:
$53,959
Cost:
$13,380
$11,523 368,113 $6,991 492 $2,751 400 $27,720 6,600,000 $4,974 37,905 $11,523
368,113
kWh
$6,991
492
kW-months/year
$2,751
400
MMBtu
$27,720
6,600,000
Tgal
$4,974
37,905
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)