Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1996
Principal Product Precast reinforced concrete pipes and boxes
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 48,615
Annual Production 52,000 Pounds
Production Hrs. Annual 2,210
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $431,749 4,317,120 kWh $0.10
Electricity Demand $4,925 2,679 kW-months/year $1.84
Electricity Fees $102 - $ -
TOTAL ENERGY COSTS $446,350
RECOMMENDED SAVINGS* $13,173 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,932
Cost:
$4,900
$1,710 30,188 $222 121 - - $1,710
30,188
kWh
$222
121
kW-months/year
-
-
lb
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$841
Cost:
-
$706 12,603 $135 78 - - $706
12,603
kWh
$135
78
kW-months/year
-
-
lb
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$756
Cost:
$150
$756 13,482 - - - - $756
13,482
kWh
-
-
kW-months/year
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$70
Cost:
$53
$59 1,172 $11 6 - - $59
1,172
kWh
$11
6
kW-months/year
-
-
lb
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,750
Cost:
$75
- - - - $2,750 1,300 -
-
kWh
-
-
kW-months/year
$2,750
1,300
lb
06: 3.7132 REUSE RAGS UNTIL COMPLETELY SOILED Savings:
$1,169
Cost:
-
- - - - $1,169 900 -
-
kWh
-
-
kW-months/year
$1,169
900
lb
07: 3.7212 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) Savings:
$5,655
Cost:
$2,000
- - - - $5,655 432,000 -
-
kWh
-
-
kW-months/year
$5,655
432,000
lb
TOTAL RECOMMENDED Savings:
$13,173
Cost:
$7,178
$3,231 57,445 $368 205 $9,574 434,200 $3,231
57,445
kWh
$368
205
kW-months/year
$9,574
434,200
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb