IAC logo
IAC Assessment: KG0058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1996
Principal Product Men and ladies denim jeans
NAICS n/a
SIC 2325 - Men's and Boys' Separate Trousers and Slacks
Sales $100,000,000-$500,000,000
# of Employees 625
Plant Area (Sq.Ft.) 190,000
Annual Production 21,000 Thousand Feet
Production Hrs. Annual 2,266
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $281,284 5,836,753 kWh $0.05
Electricity Demand $31,987 16,464 kW-months/year $1.94
Electricity Fees $2,216 - $ -
TOTAL ENERGY COSTS $328,715
RECOMMENDED SAVINGS* $60,856 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,220
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,449
Cost:
$16,500
$15,126 111,958 $323 153 - - $15,126
111,958
kWh
$323
153
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,585
Cost:
$6,796
$9,509 195,780 $1,076 546 - - $9,509
195,780
kWh
$1,076
546
kW-months/year
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,147
Cost:
$19,100
$8,789 180,832 $358 182 - - $8,789
180,832
kWh
$358
182
kW-months/year
-
-
lb
04: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$5,489
Cost:
$60
$5,489 121,923 - - - - $5,489
121,923
kWh
-
-
kW-months/year
-
-
lb
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,022
Cost:
$12,000
$3,960 11,137 $62 29 - - $3,960
11,137
kWh
$62
29
kW-months/year
-
-
lb
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,937
Cost:
-
$2,820 58,030 $117 59 - - $2,820
58,030
kWh
$117
59
kW-months/year
-
-
lb
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$8,771
Cost:
-
- - - - $8,771 114,800 -
-
kWh
-
-
kW-months/year
$8,771
114,800
lb
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$4,456
Cost:
$1,500
- - - - $4,456 16,859 -
-
kWh
-
-
kW-months/year
$4,456
16,859
lb
TOTAL RECOMMENDED Savings:
$60,856
Cost:
$55,956
$45,693 679,660 $1,936 969 $13,227 131,659 $45,693
679,660
kWh
$1,936
969
kW-months/year
$13,227
131,659
lb
TOTAL IMPLEMENTED Savings:
$46,220
Cost:
$36,796
$31,415 376,905 $1,578 787 $13,227 131,659 $31,415
376,905
kWh
$1,578
787
kW-months/year
$13,227
131,659
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)