IAC logo
IAC Assessment: KG0061
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0061
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1996
Principal Product Shrimp, Onionrings, Cheese sticks and french toast
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 130,000
Annual Production 32,000,000 Pounds
Production Hrs. Annual 2,340
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $481,564 10,296,014 kWh $0.05
Electricity Demand $39,899 22,824 kW-months/year $1.75
Electricity Fees $9,141 - $ -
Natural Gas $45,239 17,732 MMBtu $2.55
TOTAL ENERGY COSTS $2,746,273
RECOMMENDED SAVINGS* $137,342 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $135,230
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ Tgal $ lb
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$55,998
Cost:
$50
$51,948 1,105,217 $4,050 2,131 - - - - $51,948
1,105,217
kWh
$4,050
2,131
kW-months/year
-
-
Tgal
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$13,385
Cost:
$26,920
$12,603 268,171 $782 412 - - - - $12,603
268,171
kWh
$782
412
kW-months/year
-
-
Tgal
-
-
lb
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,547
Cost:
$450
$3,547 75,322 - - - - - - $3,547
75,322
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$988
Cost:
$3,270
$988 21,102 - - - - - - $988
21,102
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,622
Cost:
$270
$2,376 50,410 $246 130 - - - - $2,376
50,410
kWh
$246
130
kW-months/year
-
-
Tgal
-
-
lb
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,004
Cost:
$40
$1,816 38,687 $188 99 - - - - $1,816
38,687
kWh
$188
99
kW-months/year
-
-
Tgal
-
-
lb
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,124
Cost:
$520
$1,018 21,688 $106 56 - - - - $1,018
21,688
kWh
$106
56
kW-months/year
-
-
Tgal
-
-
lb
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,057
Cost:
$3,503
$957 20,516 $100 53 - - - - $957
20,516
kWh
$100
53
kW-months/year
-
-
Tgal
-
-
lb
09: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$49,625
Cost:
$65,000
- - - - - - $49,625 2,550 -
-
kWh
-
-
kW-months/year
-
-
Tgal
$49,625
2,550
lb
10: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$2,220
Cost:
$975
- - - - $2,220 968,400 - - -
-
kWh
-
-
kW-months/year
$2,220
968,400
Tgal
-
-
lb
11: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$4,772
Cost:
$100
- - - - $4,772 1,797,120 - - -
-
kWh
-
-
kW-months/year
$4,772
1,797,120
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$137,342
Cost:
$101,098
$75,253 1,601,113 $5,472 2,881 $6,992 2,765,520 $49,625 2,550 $75,253
1,601,113
kWh
$5,472
2,881
kW-months/year
$6,992
2,765,520
Tgal
$49,625
2,550
lb
TOTAL IMPLEMENTED Savings:
$135,230
Cost:
$97,308
$73,247 1,558,323 $5,366 2,825 $6,992 2,765,520 $49,625 2,550 $73,247
1,558,323
kWh
$5,366
2,825
kW-months/year
$6,992
2,765,520
Tgal
$49,625
2,550
lb
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)