IAC logo
IAC Assessment: KG0065
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0065
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1996
Principal Product Electronic Power Supplies
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 30,000
Annual Production 1,224,000 Pieces
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,480 1,677,022 kWh $0.03
Electricity Demand $49,171 3,486 kW-months/year $14.11
Electricity Fees $3,382 - $ -
TOTAL ENERGY COSTS $346,790
RECOMMENDED SAVINGS* $30,019 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$14,183
Cost:
$8,000
$5,524 182,884 $11,780 835 $(-3,121) (-156) - - - - $5,524
182,884
kWh
$11,780
835
kW-months/year
$(-3,121)
(-156)
MMBtu
-
-
gal
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,588
Cost:
$906
$3,320 109,906 $2,268 161 - - - - - - $3,320
109,906
kWh
$2,268
161
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,200
Cost:
$3,480
$1,868 180,832 $1,332 92 - - - - - - $1,868
180,832
kWh
$1,332
92
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$732
Cost:
$300
$732 24,326 - - - - - - - - $732
24,326
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
05: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$427
Cost:
$400
$427 14,068 - - - - - - - - $427
14,068
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
06: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$5,889
Cost:
$3,200
- - - - - - $2,149 132 $3,740 4,313 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,149
132
gal
$3,740
4,313
lb
TOTAL RECOMMENDED Savings:
$30,019
Cost:
$16,286
$11,871 512,016 $15,380 1,088 $(-3,121) (-156) $2,149 132 $3,740 4,313 $11,871
512,016
kWh
$15,380
1,088
kW-months/year
$(-3,121)
(-156)
MMBtu
$2,149
132
gal
$3,740
4,313
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)