IAC logo
IAC Assessment: KG0076
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0076
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1997
Principal Product Commercial flow manifold
NAICS n/a
SIC 3491 - Industrial Valves
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 80,000
Annual Production 250,000 Pieces
Production Hrs. Annual 7,488
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $256,053 5,422,040 kWh $0.05
Electricity Demand $125,089 9,252 kW-months/year $13.52
Natural Gas $2,973 522 MMBtu $5.70
TOTAL ENERGY COSTS $442,410
RECOMMENDED SAVINGS* $1,601,721 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$12,073
Cost:
$16,470
$8,759 225,088 $3,314 245 - - - - - - $8,759
225,088
kWh
$3,314
245
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,973
Cost:
$2,100
$1,608 66,530 $7,301 540 $(-1,936) (-340) - - - - $1,608
66,530
kWh
$7,301
540
kW-months/year
$(-1,936)
(-340)
MMBtu
-
-
lb
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$18,271
Cost:
$4,600
$18,271 754,982 - - - - - - - - $18,271
754,982
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,757
Cost:
$593
$2,757 56,858 - - - - - - - - $2,757
56,858
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$562
Cost:
$450
$562 23,154 - - - - - - - - $562
23,154
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,248
Cost:
-
- - - - - - $1,248 15,600 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,248
15,600
lb
-
-
$
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,333
Cost:
-
- - - - - - $2,333 24,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,333
24,000
lb
-
-
$
08: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$1,557,504
Cost:
$4,414
- - - - - - - - $1,557,504 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,557,504
-
$
TOTAL RECOMMENDED Savings:
$1,601,721
Cost:
$28,627
$31,957 1,126,612 $10,615 785 $(-1,936) (-340) $3,581 39,600 $1,557,504 - $31,957
1,126,612
kWh
$10,615
785
kW-months/year
$(-1,936)
(-340)
MMBtu
$3,581
39,600
lb
$1,557,504
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product