IAC logo
IAC Assessment: KG0085
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0085
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1997
Principal Product Children's apparel
NAICS n/a
SIC 2380 -
Sales $50,000,000-$100,000,000
# of Employees 365
Plant Area (Sq.Ft.) 108,000
Annual Production 14,400,000 Pieces
Production Hrs. Annual 2,125
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,800 2,021,395 kWh $0.05
Electricity Demand $22,824 8,157 kW-months/year $2.80
Electricity Fees $5,643 - $ -
TOTAL ENERGY COSTS $2,658,069
RECOMMENDED SAVINGS* $271,070 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,457
Cost:
$3,000
$7,457 140,680 - - - - - - $7,457
140,680
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,185
Cost:
$2,412
$3,615 68,288 $570 257 - - - - $3,615
68,288
kWh
$570
257
kW-months/year
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$885
Cost:
$1,620
$820 15,533 $65 30 - - - - $820
15,533
kWh
$65
30
kW-months/year
-
-
lb
-
-
$
04: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$4,140
Cost:
$1,025
- - - - $4,140 88,070 - - -
-
kWh
-
-
kW-months/year
$4,140
88,070
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,063
Cost:
-
- - - - $5,063 225,000 - - -
-
kWh
-
-
kW-months/year
$5,063
225,000
lb
-
-
$
06: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$1,708
Cost:
-
- - - - $1,708 35,100 - - -
-
kWh
-
-
kW-months/year
$1,708
35,100
lb
-
-
$
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$247,632
Cost:
$45,000
- - - - - - $247,632 - -
-
kWh
-
-
kW-months/year
-
-
lb
$247,632
-
$
TOTAL RECOMMENDED Savings:
$271,070
Cost:
$53,057
$11,892 224,501 $635 287 $10,911 348,170 $247,632 - $11,892
224,501
kWh
$635
287
kW-months/year
$10,911
348,170
lb
$247,632
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product