IAC logo
IAC Assessment: KG0088
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0088
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1997
Principal Product Metal valve parts and custom made metal parts
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $1,000,000-$5,000,000
# of Employees 65
Plant Area (Sq.Ft.) 38,500
Annual Production 9,000 Pieces
Production Hrs. Annual 6,448
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,632 620,457 kWh $0.04
Electricity Demand $17,792 2,224 kW-months/year $8.00
Electricity Fees $938 - $ -
TOTAL ENERGY COSTS $65,255
RECOMMENDED SAVINGS* $52,966 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,621
Cost:
$12,410
$3,720 89,097 $901 113 - - - - $3,720
89,097
kWh
$901
113
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,696
Cost:
$6,689
$1,216 29,015 $480 60 - - - - $1,216
29,015
kWh
$480
60
kW-months/year
-
-
lb
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$892
Cost:
$450
$892 21,395 - - - - - - $892
21,395
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$4,800
Cost:
$243
- - - - $4,800 872,720 - - -
-
kWh
-
-
kW-months/year
$4,800
872,720
lb
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$3,231
Cost:
-
- - - - $3,231 7,800 - - -
-
kWh
-
-
kW-months/year
$3,231
7,800
lb
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$312
Cost:
-
- - - - $312 156 - - -
-
kWh
-
-
kW-months/year
$312
156
lb
-
-
$
07: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$37,414
Cost:
$14,190
- - - - - - $37,414 - -
-
kWh
-
-
kW-months/year
-
-
lb
$37,414
-
$
TOTAL RECOMMENDED Savings:
$52,966
Cost:
$33,982
$5,828 139,507 $1,381 173 $8,343 880,676 $37,414 - $5,828
139,507
kWh
$1,381
173
kW-months/year
$8,343
880,676
lb
$37,414
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product