IAC logo
IAC Assessment: KG0089
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0089
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1997
Principal Product Accessories for beverage industry
NAICS n/a
SIC 3325 - Steel Foundries, Nec
Sales $10,000,000-$50,000,000
# of Employees 380
Plant Area (Sq.Ft.) 82,030
Annual Production 11,000,000 Pieces
Production Hrs. Annual 5,020
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,376 2,747,362 kWh $0.03
Electricity Demand $47,392 7,072 kW-months/year $6.70
Electricity Fees $1,681 - $ -
TOTAL ENERGY COSTS $226,709
RECOMMENDED SAVINGS* $89,851 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$39,149
Cost:
-
$39,149 3,232,122 - - - - - - $39,149
3,232,122
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$6,852
Cost:
$790
$6,852 565,651 - - - - - - $6,852
565,651
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,955
Cost:
$3,380
$4,955 128,370 - - - - - - $4,955
128,370
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,400
Cost:
-
$2,927 92,321 $1,473 221 - - - - $2,927
92,321
kWh
$1,473
221
kW-months/year
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,294
Cost:
$422
$846 26,671 $448 67 - - - - $846
26,671
kWh
$448
67
kW-months/year
-
-
lb
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,006
Cost:
$600
$1,006 31,653 - - - - - - $1,006
31,653
kWh
-
-
kW-months/year
-
-
lb
-
-
$
07: 3.8136 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED Savings:
$4,062
Cost:
$7,900
- - - - $4,062 42,000 - - -
-
kWh
-
-
kW-months/year
$4,062
42,000
lb
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$550
Cost:
$300
- - - - $550 20,000 - - -
-
kWh
-
-
kW-months/year
$550
20,000
lb
-
-
$
09: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$258
Cost:
-
- - - - $258 5,400 - - -
-
kWh
-
-
kW-months/year
$258
5,400
lb
-
-
$
10: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$27,325
Cost:
$1,612
- - - - - - $27,325 - -
-
kWh
-
-
kW-months/year
-
-
lb
$27,325
-
$
TOTAL RECOMMENDED Savings:
$89,851
Cost:
$15,004
$55,735 4,076,788 $1,921 288 $4,870 67,400 $27,325 - $55,735
4,076,788
kWh
$1,921
288
kW-months/year
$4,870
67,400
lb
$27,325
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product