IAC logo
IAC Assessment: KG0090
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0090
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1997
Principal Product Aero-lift trucks and digger trucks.
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 14,000
Annual Production 250 Pieces
Production Hrs. Annual 2,168
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $13,330 411,196 kWh $0.03
Electricity Demand $11,371 1,699 kW-months/year $6.69
Electricity Fees $1,560 - $ -
Natural Gas $16,786 3,308 MMBtu $5.07
TOTAL ENERGY COSTS $75,806
RECOMMENDED SAVINGS* $20,258 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,483
Cost:
$1,650
$1,483 46,014 - - - - - - $1,483
46,014
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,183
Cost:
$3,124
$590 18,171 $593 89 - - - - $590
18,171
kWh
$593
89
kW-months/year
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$345
Cost:
$1,210
$194 5,862 $151 23 - - - - $194
5,862
kWh
$151
23
kW-months/year
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,647
Cost:
$329
- - - - $4,647 12,000 - - -
-
kWh
-
-
kW-months/year
$4,647
12,000
lb
-
-
$
05: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$12,600
Cost:
$9,380
- - - - - - $12,600 - -
-
kWh
-
-
kW-months/year
-
-
lb
$12,600
-
$
TOTAL RECOMMENDED Savings:
$20,258
Cost:
$15,693
$2,267 70,047 $744 112 $4,647 12,000 $12,600 - $2,267
70,047
kWh
$744
112
kW-months/year
$4,647
12,000
lb
$12,600
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product