IAC logo
IAC Assessment: KU0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1982
Principal Product AVIATION ELECTRONICS
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 375
Plant Area (Sq.Ft.) 0
Annual Production 12,500 Pieces
Production Hrs. Annual 4,250
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,521 1,345,545 kWh $0.04
Natural Gas $3,712 1,228 MMBtu $3.02
TOTAL ENERGY COSTS $62,233
RECOMMENDED SAVINGS* $14,280 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$6,130
Cost:
$6,000
$4,590 105,510 $1,540 510 $4,590
105,510
kWh
$1,540
510
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,770
Cost:
$3,635
$3,770 86,753 - - $3,770
86,753
kWh
-
-
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,680
Cost:
-
$1,680 - - - $1,680
-
kWh
-
-
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,240
Cost:
$1,600
$1,240 - - - $1,240
-
kWh
-
-
MMBtu
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$450
Cost:
$869
- - $450 149 -
-
kWh
$450
149
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$315
Cost:
$700
- - $315 104 -
-
kWh
$315
104
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$695
Cost:
$600
$990 22,860 $(-295) (-97) $990
22,860
kWh
$(-295)
(-97)
MMBtu
TOTAL RECOMMENDED Savings:
$14,280
Cost:
$13,404
$12,270 215,123 $2,010 666 $12,270
215,123
kWh
$2,010
666
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas