IAC Assessment: KU0053
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0053
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1982
Principal Product GRINDING MACHINES
NAICS n/a
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 0
Annual Production 4,500,150 Pieces
Production Hrs. Annual 8,544
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $177,821 4,254,396 kWh $0.04
Natural Gas $15,261 5,866 MMBtu $2.60
TOTAL ENERGY COSTS $193,082
RECOMMENDED SAVINGS* $51,411 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,781
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,126
Cost:
$9,767
$12,126 290,152 - - $12,126
290,152
kWh
-
-
MMBtu
02: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$24,341
Cost:
$10,000
$17,591 420,868 $6,750 2,596 $17,591
420,868
kWh
$6,750
2,596
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,175
Cost:
$360
$257 6,155 $1,918 737 $257
6,155
kWh
$1,918
737
MMBtu
04: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$1,069
Cost:
$250
- - $1,069 411 -
-
kWh
$1,069
411
MMBtu
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$9,630
Cost:
$5,700
$9,630 - - - $9,630
-
kWh
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$674
Cost:
$90
$674 16,120 - - $674
16,120
kWh
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$256
Cost:
$80
$256 6,155 - - $256
6,155
kWh
-
-
MMBtu
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,140
Cost:
$1,320
- - $1,140 438 -
-
kWh
$1,140
438
MMBtu
TOTAL RECOMMENDED Savings:
$51,411
Cost:
$27,567
$40,534 739,450 $10,877 4,182 $40,534
739,450
kWh
$10,877
4,182
MMBtu
TOTAL IMPLEMENTED Savings:
$41,781
Cost:
$21,867
$30,904 739,450 $10,877 4,182 $30,904
739,450
kWh
$10,877
4,182
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas