IAC logo
IAC Assessment: KU0116
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0116
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1984
Principal Product JEANS,JACKETS
NAICS n/a
SIC 2325 - Men's and Boys' Separate Trousers and Slacks
Sales $10,000,000-$50,000,000
# of Employees 430
Plant Area (Sq.Ft.) 0
Annual Production 1,500,000 Pieces
Production Hrs. Annual 5,712
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,581 1,772,861 kWh $0.06
Natural Gas $63,404 12,247 MMBtu $5.18
TOTAL ENERGY COSTS $176,985
RECOMMENDED SAVINGS* $39,375 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,151
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 3.6122 INSTALL SOLID WASTE INCINERATOR FOR HEAT Savings:
$22,384
Cost:
$41,760
- - $27,739 5,355 $(-5,355) (-5,355) - - -
-
kWh
$27,739
5,355
MMBtu
$(-5,355)
(-5,355)
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,279
Cost:
$4,658
$4,279 66,823 - - - - - - $4,279
66,823
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,138
Cost:
-
- - $1,538 297 - - $(-400) - -
-
kWh
$1,538
297
MMBtu
-
-
MMBtu
$(-400)
-
$
04: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$1,182
Cost:
$100
$94 1,465 $1,088 210 - - - - $94
1,465
kWh
$1,088
210
MMBtu
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,118
Cost:
$525
- - $3,118 602 - - - - -
-
kWh
$3,118
602
MMBtu
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,515
Cost:
$230
$2,515 39,273 - - - - - - $2,515
39,273
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$848
Cost:
-
$848 13,189 - - - - - - $848
13,189
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$370
Cost:
$410
$370 5,862 - - - - - - $370
5,862
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$2,065
Cost:
$3,200
$2,065 32,239 - - - - - - $2,065
32,239
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$896
Cost:
$2,095
- - $896 173 - - - - -
-
kWh
$896
173
MMBtu
-
-
MMBtu
-
-
$
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$316
Cost:
$60
- - $316 61 - - - - -
-
kWh
$316
61
MMBtu
-
-
MMBtu
-
-
$
12: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$264
Cost:
$160
- - $264 51 - - - - -
-
kWh
$264
51
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$39,375
Cost:
$53,198
$10,171 158,851 $34,959 6,749 $(-5,355) (-5,355) $(-400) - $10,171
158,851
kWh
$34,959
6,749
MMBtu
$(-5,355)
(-5,355)
MMBtu
$(-400)
-
$
TOTAL IMPLEMENTED Savings:
$5,151
Cost:
$390
$2,609 40,738 $2,942 568 - - $(-400) - $2,609
40,738
kWh
$2,942
568
MMBtu
-
-
MMBtu
$(-400)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes