IAC logo
IAC Assessment: KU0117
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0117
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1984
Principal Product BIOLOGICAL PRODUCTS
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 0
Annual Production 3,650,000 Pounds
Production Hrs. Annual 2,268
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $467,838 8,165,885 kWh $0.06
Natural Gas $202,809 40,996 MMBtu $4.95
Fuel Oil #2 $45,423 6,300 MMBtu $7.21
TOTAL ENERGY COSTS $716,070
RECOMMENDED SAVINGS* $65,009 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,126
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$13,895
Cost:
$15,000
- - $11,321 2,287 $2,574 357 -
-
kWh
$11,321
2,287
MMBtu
$2,574
357
MMBtu
02: 2.1222 INSTALL TURBULATORS Savings:
$4,977
Cost:
$2,620
- - $4,054 819 $923 128 -
-
kWh
$4,054
819
MMBtu
$923
128
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,455
Cost:
$300
$7,455 130,129 - - $(-4,000) (-555) $7,455
130,129
kWh
-
-
MMBtu
$(-4,000)
(-555)
MMBtu
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$18,415
Cost:
$4,200
- - $15,003 3,031 $3,412 473 -
-
kWh
$15,003
3,031
MMBtu
$3,412
473
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,702
Cost:
$9,600
$6,702 - - - - - $6,702
-
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,430
Cost:
$2,900
- - $1,430 289 - - -
-
kWh
$1,430
289
MMBtu
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$336
Cost:
$500
$336 5,862 - - - - $336
5,862
kWh
-
-
MMBtu
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,541
Cost:
$4,029
$5,541 96,717 - - - - $5,541
96,717
kWh
-
-
MMBtu
-
-
MMBtu
09: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$4,088
Cost:
$1,026
- - $3,331 673 $757 105 -
-
kWh
$3,331
673
MMBtu
$757
105
MMBtu
10: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$6,170
Cost:
$3,772
- - $5,044 1,019 $1,126 159 -
-
kWh
$5,044
1,019
MMBtu
$1,126
159
MMBtu
TOTAL RECOMMENDED Savings:
$65,009
Cost:
$43,947
$20,034 232,708 $40,183 8,118 $4,792 667 $20,034
232,708
kWh
$40,183
8,118
MMBtu
$4,792
667
MMBtu
TOTAL IMPLEMENTED Savings:
$30,126
Cost:
$12,001
$5,541 96,717 $20,047 4,050 $4,538 632 $5,541
96,717
kWh
$20,047
4,050
MMBtu
$4,538
632
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2