IAC Assessment: KU0166
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0166
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1985
Principal Product WOOD MILLWORK
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 66
Plant Area (Sq.Ft.) 0
Annual Production 30,000 Pieces
Production Hrs. Annual 2,210
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,140 485,053 kWh $0.08
Natural Gas $15,582 3,750 MMBtu $4.16
Other Energy $99,125 14,076 MMBtu $7.04
TOTAL ENERGY COSTS $152,847
RECOMMENDED SAVINGS* $18,344 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,715
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT Savings:
$9,399
Cost:
$18,000
- - $11,569 2,781 - - $(-2,170) - -
-
kWh
$11,569
2,781
MMBtu
-
-
MMBtu
$(-2,170)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,366
Cost:
$4,731
$5,366 68,288 - - - - - - $5,366
68,288
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,108
Cost:
$2,000
$1,108 - - - - - - - $1,108
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE Savings:
$1,028
Cost:
-
- - - - $1,028 146 - - -
-
kWh
-
-
MMBtu
$1,028
146
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$484
Cost:
$200
$484 6,155 - - - - - - $484
6,155
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$461
Cost:
$150
$461 5,862 - - - - - - $461
5,862
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$268
Cost:
-
$368 4,689 - - - - $(-100) - $368
4,689
kWh
-
-
MMBtu
-
-
MMBtu
$(-100)
-
$
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$230
Cost:
$110
$230 2,931 - - - - - - $230
2,931
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,344
Cost:
$25,191
$8,017 87,925 $11,569 2,781 $1,028 146 $(-2,270) - $8,017
87,925
kWh
$11,569
2,781
MMBtu
$1,028
146
MMBtu
$(-2,270)
-
$
TOTAL IMPLEMENTED Savings:
$8,715
Cost:
$7,081
$7,787 84,994 - - $1,028 146 $(-100) - $7,787
84,994
kWh
-
-
MMBtu
$1,028
146
MMBtu
$(-100)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes